📅 Date: 26/11/2025
📍 Location: Zoom
🕐 Duration: 20.00 - 20.40
📝 Note Taker: Arda Yalçındağ

👥 Attendees

Agenda

  1. Distribute the tasks for milestone 2 report.
  2. Discuss how to proceed for milestone 3 and which features/enhancements should be prioritized.

Discussion Items

  • Discussed about how frontend behaves if a false URL is returned from backend for a picture URL requests posts. This is relevant since the database will be migrated soon and this situation might be the case.
  • Milestone 2 deliverables document on the Moodle was read and analyzed together as a team and discussed about it.
  • Distributed the tasks for milestone 2 report. The tasks and their assignees are in the action items.
  • The requirements were reviewed one by one. Discussed which ones are done and which ones are remaining for milestone 3, and also which ones should be prioritized. Details:
    • Report/ Moderator should be the first priority. We can set predefined categories for the reason of report and a text box. Moderator should be able to see reports and take action.
    • Points system in challenges/ badges should be the second important feature to implement. Challenges should have predefined types just like in the waste goal. Logs should correspond to points and leaderboards should be according to points. Badges should be able to earned in cases like finishing the leaderboard in the first place etc.
    • Feedback should be implemented. There should be a simple button and a text box. Moderator should be able to see the feedback.
    • Tagging in posts should be implemented. The post should have tags such as plastic, recycling etc. and users should be able to search for posts with a desired tag.
    • Reset password functionality should be implemented. It will be a fairly simple feature to implement.

Action Items

# Details Assignee(s) Deadline
1 write "A summary of the customer feedback and reflections" section of milestone 2 report Serdar Bahar, Yusuf Onur Öksüz, Abdülkerim Kasar 28.11.2025 - 17.00
2 write "List and status of all the project deliverables" section of milestone 2 report Abdülkerim Kasar 28.11.2025 - 17.00
3 write "Evaluation of the status of deliverables and its impact on your project plan" section of milestone 2 report Ali Bartu Konca 28.11.2025 - 17.00
4 write "Evaluation of tools and processes you have used to manage your team project" section of milestone 2 report Cengiz Bilal Sarı 28.11.2025 - 17.00
5 write "The requirements addressed in this milestone" section of milestone 2 report Cengiz Bilal Sarı 28.11.2025 - 17.00
6 write "Planning and Team Process" section of milestone 2 report Emre Kılıç 28.11.2025 - 17.00
7 write "Utilized Standards" section of milestone 2 report Ali Bartu Konca (Activity Streams 2.0), Arda Yalçındağ/Serdar Bahar (WCAG 2.1, i18n) 28.11.2025 - 17.00
8 write "UX Design" section of milestone 2 report Abdurrahman Arslan, Arda Yalçındağ 28.11.2025 - 17.00
9 write "Testing" section of milestone 2 report Abdülkerim Kasar (Mobile), Yüksel Eren Şen (Frontend), Cengiz Bilal Sarı (Backend) 28.11.2025 - 17.00