10‐13‐AbdülkerimKasar - bounswe/bounswe2025group5 GitHub Wiki

Report of Week 4: 13 October - 19 October

Contribution Related Reference
1 During Lab 4, discussed Mobile deliverables for demo Demo Scenario
2 During Lab 4, discussed next week's presentation flow and related decisions
3 During Lab 4, checked mobile team's updates
4 I updated mobile api integrations to match new backend endpoints #395 #PR442
5 I did some improvements on mobile side to enhance feature availability and design consistency before the first milestone. #450
6 We held a meeting with web team as a mobile team and I uploaded the notes. #458
7 I implemented a zoomable image viewer, added a publish timestamp under posts, improved language-switch stability, and ensured smooth runs on both web and Android VM. #480
8 I reworked the bio preview and update flow to ensure proper visibility and synchronization. #452
9 I exposed the profile posts feed with asynchronous loading for faster perceived performance. #481
10 I refreshed Waste Goals controls and restored add, edit, delete, and log actions after recent backend endpoint changes. #454 #466
11 I added mock “Report” actions for posts/comments and introduced mock profile progress statistics as groundwork for upcoming insights. #472
12 I fixed deletion flows and aligned comment edit/delete API calls with backend parameters; verification completed. #452 #462
13 I restored the unsave flow so posts can be properly removed from the Saved Posts section. #453
14 I delivered the consolidated Milestone-1 mobile work under one comprehensive PR. PR #473
15 I assigned mobile issues and distributed the tasks across the team for balanced workload management.
16 I reviewed many of my teammates’ pull requests. PR#463 PR#427 #PR469
17 Visual improvements added to mobile side to match consistency with web application #457
18 Custom waste logging button unresponsive until backend endpoints are ready #488 , #PR489
19 I conducted two more review for Milestone-1 preperations #PR490 #PR492