| 1 |
During Lab 4, discussed Mobile deliverables for demo |
Demo Scenario |
| 2 |
During Lab 4, discussed next week's presentation flow and related decisions |
|
| 3 |
During Lab 4, checked mobile team's updates |
|
| 4 |
I updated mobile api integrations to match new backend endpoints |
#395 #PR442 |
| 5 |
I did some improvements on mobile side to enhance feature availability and design consistency before the first milestone. |
#450 |
| 6 |
We held a meeting with web team as a mobile team and I uploaded the notes. |
#458 |
| 7 |
I implemented a zoomable image viewer, added a publish timestamp under posts, improved language-switch stability, and ensured smooth runs on both web and Android VM. |
#480 |
| 8 |
I reworked the bio preview and update flow to ensure proper visibility and synchronization. |
#452 |
| 9 |
I exposed the profile posts feed with asynchronous loading for faster perceived performance. |
#481 |
| 10 |
I refreshed Waste Goals controls and restored add, edit, delete, and log actions after recent backend endpoint changes. |
#454 #466 |
| 11 |
I added mock “Report” actions for posts/comments and introduced mock profile progress statistics as groundwork for upcoming insights. |
#472 |
| 12 |
I fixed deletion flows and aligned comment edit/delete API calls with backend parameters; verification completed. |
#452 #462 |
| 13 |
I restored the unsave flow so posts can be properly removed from the Saved Posts section. |
#453 |
| 14 |
I delivered the consolidated Milestone-1 mobile work under one comprehensive PR. |
PR #473 |
| 15 |
I assigned mobile issues and distributed the tasks across the team for balanced workload management. |
— |
| 16 |
I reviewed many of my teammates’ pull requests. |
PR#463 PR#427 #PR469 |
| 17 |
Visual improvements added to mobile side to match consistency with web application |
#457 |
| 18 |
Custom waste logging button unresponsive until backend endpoints are ready |
#488 , #PR489 |
| 19 |
I conducted two more review for Milestone-1 preperations |
#PR490 #PR492 |