Meeting Notes #13 - bounswe/bounswe2024group9 GitHub Wiki

Meeting Information

Date: 19.04.2024
Time: 20:00
Online/Offline: Face to Face
Location: BM Lounge
Duration: 1 hour
Note Taker: Mustafa Atak

Attendees

  • Mehmet Emin İpekdal
  • Mustafa Atak
  • Ahmet Burak Çiçek
  • Eray Eroğlu
  • Huriye Ceylin Gebeş
  • Halil Karabacak
  • Muhammet Berkay Keskin
  • Özgür Özerdem
  • Yiğit Kağan Poyrazoğlu
  • Taha Topaloğlu
  • Kristina Trajkovski

Agenda

  1. Discuss developments about API implementation.
  2. Discuss developments about Mobile implementation
  3. Discuss developments about Web Dev implementation

Discussions

The importance of uploading notes immediately after the meeting was discussed.

A Implementation

A.1 - For API Team (Mutti and Kristina):

Important Notes for future:

  • The values in the durations array under the Route class are in minutes.
  • Wikidata result will be converted to node when creating the route
  • Photos array in Route is used for creating a slideshow at a feed, search result pages.

Decisions:

  • The kristina_wikidata_practice branch, where wikidata-related operations are implemented, needs to be reviewed. In order to speed up the work, this task was taken from Ceylin and Taha and given to Halil.

  • Location feature will be added to Node class objects

  • After that, the User class will be completed in the database_search_api branch and its endpoints will be added. Route and node objects will also be rearranged and completed by Friday evening. Later, this branch will be merged into main and the mobile and web team will use the enpoints here for the query results.

A.2 - For Web Dev Team

Decisions:

  • Login and sign up must run the APIs written by Friday and make the registration and login requests functional. Their Front-end implementation seems nice.

  • Search page and result page need to speed up their work and have the page ready by Sunday evening. Both front-end and back-end is missing

  • The website branch will be opened. It would be better if the team of Özgür who prepares the login and signup do this.

A.3 - For Mobile Team:

Decisions :

  • Implementations will be completed by Sunday evening in line with the designs created on the mockup page.

B Design

B.1 Requiremens will be revised deeply:

The web team will revise the system requirements and transfer the ones that are in the wrong place to the user requirements. The mobile team will then make the necessary corrections based on feedback on user requirements.

This task will be started after Sunday

B.2 Mockups will be controlled

One of the mockups (search results on mobile) to be looked at has not been corrected since receiving feedback. Mutti will check this and ensure that there are no problems.

C Future

It is not known whether the use case diagrams will be connected to each other. A letter has been written to Kutay teacher for feedback with the diagrams written so far, a response is awaited.

After the current pages are completed, Kristina stated that she would like to take part in the route creation and route editing pages in the web frontend. It will be discussed

Action Items

Item Responsible Person Due Date Relevant Issue Reviewer(s)
Complete the database API implementation with corrections mentioned in A.1 Mutti, Kristina 21.04.2024 23:59 #120 Halil
Connect API with login and sign-up pages Özgür, Ahmet 21.04.2024 23:59 #122
Web development branch will be opened Özgür, Ahmet 21.04.2024 23:59 #122
Complete pages for search result and search bar Eray, Emin 21.04.2024 23:59
Connect API with search result and search bar pages Eray, Emin 21.04.2024 23:59
Complete mobile implementations Mobile Team (will be mentioned in MEETING NOTES 11) 21.04.2024 23:59