Progress Summary

Our objective for the following week will be to review our project by reverifying the project requirements and the UML diagrams while on-boarding our welcomed teammates. Additionaly, we will be preparing the project plan and the responsibility assignment matrix (RAM). Also we are going to make research about the possible technologies that we can use throughout the development process.

Our plans for the next week

Description Issue Assignee Due Estimated Duration
Reverify the project requirements #240 Team 10.10.2023 1hr
Reverify the UML diagrams if needed -- Bengisu, Zülal, Leyla 10.10.2023 1hr
Update wiki pages if needed -- Leyla 10.10.2023 1hr
Decide on what technologies are going to be used for the front-end #249 Front-end team 10.10.2023 1.5hr
Decide on what technologies are going to be used for the back-end #248 Back-end team 10.10.2023 1.5hr
Prepare the project plan #243 Team 10.10.2023 3.5hr
Prepare the Responsibility Assignment Matrix (RAM) #246 Hakan, Mehmet, Arda, Abdullah 10.10.2023 2hr
Adding Personal Wiki Pages #245, #237 Bengisu, Ömer Faruk 10.10.2023 1hr

Risks

During our meeting, we talked about different frameworks that we can use. If we decide to use Flutter, we may encounter some performance issues. In addition, our team is not highly experienced in other frameworks that we listed in the meeting. If we choose one of them, We may need to spend a lot of time learning the fundamentals of these tools.

Participants

  • Ahmed Bera Pay
  • Ahmet Abdullah Susuz
  • Ali Mert Geben
  • Arda Arslan
  • Bengisu Kübra Takkin
  • Hakan Emre Aktaş
  • Leyla Yayladere
  • Mehmet Süzer
  • Ömer Faruk Ünal
  • Ömer Şükrü Uyduran
  • Zülal Molla