Journal CW39 - bjornburton/champbot GitHub Wiki
To Do in final week
- Seal drive units better
- New RC batteries (8 x AA)
- Assemble spares kit
- Assemble Tool kit
- Final pre-launch preparation (full charge)
Done
- Added rear ballast bracket and ballast (680 g more)
- Wind guard for PFI (stainless from an HDD caddy)
- Cleaned igniter electrodes
- Fix eyes (paint, attach, add eyelids)
- Add Covering
- Re-bonded UHF receiver (using plastic epoxy)
- Add adjustable ballast (washers on a copper pipe)
- Repaired TX antenna (using copper tubing, solder, copper tape and another antenna)
- Corrected for torque reaction with shims (guessing it's right)
- Found cover screw
- A periodic ignition sequence for a windy day
- Increased PFI output 20% with larger plumbing