Steps - ams10961/49es GitHub Wiki

New Bathroom / Utility Area

  • remove/dispose of kitchen cabinets, retain worktops for potential use
  • remove aga, cap gas
  • confirm whether heating supply for towel rack exists
  • confirm condition of wooden floor
  • plan new water supply and drainage layout
  • implement shower gravity drainage via external pipe - work on concrete base needed?
  • replace consumer unit and provide supply and create new ring
  • implement ceiling wiring to support spots in kitchen, bath, and utility area
  • drill hole for extractor fan
  • build internal wall, install pocket door
  • add supply / drainage pipes to the utility area
  • build housing behind toilet and sink, include cistern
  • build false wall behind utlity area
  • tile wall to window height, including behind toilet cistern
  • add light swiches to new internal wall outside bathroom
  • install ceiling spots for bath/utility area
  • installed recessed shower tray, seal
  • provide water supply to new kitchen through wall at shower end
  • build false wall containing piping, mounting for shower at window end of shower
  • tile back-wall of shower, full height
  • install and seal shower door
  • add hand-holds inside shower to tiled wall

New Kitchen

  • plan location of water supply and drainage
  • create sink drainage to outside wall (also to be used by dishwasher)
  • bore hole for extractor fan
  • create hot/cold supply via wall from bathroom
  • drill wall channels for cabling, sockets and switches
  • install cabling and sockets
  • plan and add spotlights to ceiling
  • fill wall to cover channels