Steps - ams10961/49es GitHub Wiki
New Bathroom / Utility Area
- remove/dispose of kitchen cabinets, retain worktops for potential use
- remove aga, cap gas
- confirm whether heating supply for towel rack exists
- confirm condition of wooden floor
- plan new water supply and drainage layout
- implement shower gravity drainage via external pipe - work on concrete base needed?
- replace consumer unit and provide supply and create new ring
- implement ceiling wiring to support spots in kitchen, bath, and utility area
- drill hole for extractor fan
- build internal wall, install pocket door
- add supply / drainage pipes to the utility area
- build housing behind toilet and sink, include cistern
- build false wall behind utlity area
- tile wall to window height, including behind toilet cistern
- add light swiches to new internal wall outside bathroom
- install ceiling spots for bath/utility area
- installed recessed shower tray, seal
- provide water supply to new kitchen through wall at shower end
- build false wall containing piping, mounting for shower at window end of shower
- tile back-wall of shower, full height
- install and seal shower door
- add hand-holds inside shower to tiled wall
New Kitchen
- plan location of water supply and drainage
- create sink drainage to outside wall (also to be used by dishwasher)
- bore hole for extractor fan
- create hot/cold supply via wall from bathroom
- drill wall channels for cabling, sockets and switches
- install cabling and sockets
- plan and add spotlights to ceiling
- fill wall to cover channels