Module 15 Agentic Product Lifecycle - akash-coded/aws-bedrock-agentcore-strands GitHub Wiki

📋 Module 15 · Agentic Product Lifecycle

For the people who decide what gets built, and have to defend it.

Module 15 of 16 · track Product · parallel · Estimated time: 4–5 hours · Prerequisites: Module 00. Module 02 helps for the cost conversations.

A parallel track for product managers, architects and leads. Same domain, different artefacts: which documents are owed at which gate, how to run a gate review, and how to answer the cost-cut ultimatum without destroying the product.

Open the module on GitHub ↗: the slides, notebooks, exercises and solutions are there. This page is the reading order, with the tutorial and the workbench alongside.

Read first, on the site

The lesson that frames this module is The Agentic PDLC for Product Managers: What Changes Monday (6 min): the product manager's eight steps, which this module practises. Then try the value line calculator in the workbench: the same decision, with your numbers.

What you will be able to do

  • Name the artefacts owed at each stage of an agentic build
  • Run a gate review and make a defensible go/no-go call
  • Set a guardrail bar that engineering can actually meet
  • Respond to a cost-cut demand with options rather than capitulation

Concepts in this module

Portable GenAI concepts AWS-specific surface
Agentic PDLC Cost modelling for Bedrock and AgentCore
Artefact sets
Gate reviews
Guardrail policy
Scope negotiation

Portable concepts transfer to any stack. The AWS column is where this module touches the cloud — see docs/concepts/portability-matrix.md.

Run it in this order

# Step What it is
1 📖 slides/The_Agentic_Artefact_Set.pptx The agentic artefact set
2 ✏️ exercises/Exercise_1_Artefacts_Owed.md Exercise 1 — artefacts owed
3 📊 activities/WB1_Artefact_Decision_Tool.xlsx Artefact decision tool
4 ✏️ exercises/Exercise_2_Decision_Tree.md Exercise 2 — decision tree
5 ✏️ exercises/Exercise_3_Wrong_Ceiling.md Exercise 3 — the wrong ceiling
6 ✏️ exercises/Exercise_4_Guardrail_Bar.md Exercise 4 — the guardrail bar
7 📊 activities/WB2_Backlog_Artefact_Planner.xlsx Backlog artefact planner
8 ✏️ exercises/Exercise_A_The_Gate_Review.md Exercise A — the gate review
9 ✏️ exercises/Exercise_B_The_Cost_Cut_Ultimatum.md Exercise B — the cost-cut ultimatum

📖 read   💻 run   ✏️ practise   📊 workbook   🔖 reference

Worked solutions live in solutions/. Attempt every exercise closed-book first — the solutions are written to be read after you have a wrong answer to compare against.

Common mistakes

  • Approving a gate on demo quality. Demos are chosen; production is not.
  • A guardrail bar set without asking engineering what it costs to meet.

When it breaks

Every error anyone has hit in this course is in the Error Index, by the exact string. Model access and region problems are in Model and Region Notes. If it is a question rather than an error, check the answered ones first, then ask in Q&A.

Field guide for this module

Frameworks

Recipes and procedures


← Module 14 · End-to-End Production Pipeline · All modules · Prove it in the labs →

✏️ This page is generated from modules/15-agentic-product-lifecycle/README.md. To change it, edit the module README: an edit made here is replaced at the next sync.

⚠️ **GitHub.com Fallback** ⚠️