PrettyGirlz Project Setup ‐ Comprehensive Plan - Wiz-DevTech/prettygirllz GitHub Wiki

  1. ClickUp Hierarchy Implementation Space Configuration

Name: PrettyGirlz Dev Description: Development environment for PrettyGirlz LLC candy store application Privacy: Private (team-only) ClickUp Configuration Token: pg-agt-2024-06

Folder & List Structure └── 1. Core Services └── user-service ├── Status fields: Not Started, In Progress, Code Review, QA, Done ├── Custom fields: Story Points, Test Coverage, Role (Admin/Seller/Customer) └── product-service ├── Status fields: Not Started, In Progress, Code Review, QA, Done ├── Custom fields: Story Points, Test Coverage, Module (Candy/Fashion) └── delivery-service ├── Status fields: Not Started, In Progress, Code Review, QA, Done ├── Custom fields: Story Points, Test Coverage, Type (Home/DropZone) └── chat-service ├── Status fields: Not Started, In Progress, Code Review, QA, Done ├── Custom fields: Story Points, Test Coverage, Mode (Product/Social) └── API Contracts ├── Status fields: Draft, Review, Approved, Implemented ├── Custom fields: Service Owner, Swagger URL, Version

└── 2. UI/UX └── Component Library ├── Status fields: Design, Implementation, Review, Complete ├── Custom fields: Design Link, Browser Support └── User Flows ├── Status fields: Draft, Prototyping, User Testing, Approved ├── Custom fields: User Persona, Success Metrics └── Design System ├── Status fields: Concept, Development, Documentation, Released ├── Custom fields: Version, Platform Compatibility ├── Custom fields: Color Palette (Pink/Peach/Purple)

└── 3. QA └── Test Cases ├── Status fields: Draft, Automated, Manual, Executed ├── Custom fields: Feature Coverage, Test Type └── Performance Tests ├── Status fields: Defined, Implemented, Executed, Analyzed ├── Custom fields: Load Target (500 users), Response Time (<2s) └── Bug Tracking ├── Status fields: New, Investigating, Fixed, Verified ├── Custom fields: Severity, Environment, Steps to Reproduce

└── 4. DevOps └── CI/CD Pipelines ├── Status fields: Design, Implementation, Testing, Active ├── Custom fields: Pipeline Type, Average Run Time └── Infrastructure ├── Status fields: Planning, Provisioning, Configuration, Live ├── Custom fields: Cloud Provider, Monthly Cost └── Monitoring ├── Status fields: Setup, Testing, Active, Alerting ├── Custom fields: Alert Recipients, Metrics ├── Custom fields: Success Metrics (QR Pickups, Cart Abandonment, Retention) Template Application

Apply Microservice Sprint Template to all Core Services lists Apply UI Component Template to Component Library list Apply JSP/Bootstrap Template to UI implementation tasks

  1. Task Creation Examples User Service Epic markdown# User Service

Technical Acceptance Criteria

  • Support three user roles: Admin, Seller, Customer
  • Registration flow with email verification
  • Password recovery system with secure reset
  • Profile management with avatar upload
  • Role-based access control
  • BCrypt password hashing
  • Must support 500 concurrent users

Architecture

[See architecture diagram]

Dependencies

  • MongoDB (users collection)
  • Cloudinary (for avatar storage)

GitHub

  • Branch: feature/user-service
  • Required reviewers: @techLead, @securityReviewer

Tasks

  • [BE] Implement user registration & email verification (3d)
  • [BE] Create role-based access control (2d)
  • [BE] Build password reset flow (2d)
  • [BE] Develop profile management API (3d)
  • [FE] Registration form with validation (2d)
  • [FE] Profile management UI (3d)
  • [FE] Avatar upload component (2d)
  • [FLOW] Admin user management dashboard (3d) Product Service - Fashion Store Epic markdown# Fashion Store Module

Technical Acceptance Criteria

  • Clothing/accessory catalog with filtering
  • Avatar-based virtual try-on system
  • Outfit sharing to chat feature
  • Review system with photo upload
  • Mobile-responsive product displays
  • Shopping cart and checkout flow

Architecture

[See architecture diagram]

Dependencies

  • user-service (for avatar integration)
  • chat-service (for outfit sharing)
  • MongoDB (products collection)
  • Cloudinary (for product images)

GitHub

  • Branch: feature/fashion-store
  • Required reviewers: @techLead, @uiReviewer

Tasks

  • [BE] Implement fashion product catalog API (3d)
  • [BE] Create avatar try-on engine (5d)
  • [BE] Build outfit sharing API (2d)
  • [BE] Develop review system with image upload (3d)
  • [FE] Product catalog with filters (3d)
  • [FE] Avatar try-on interface (4d)
  • [FE] Shopping cart and checkout flow (4d)
  • [FE] Product review component (2d)
  • [FLOW] Integration with chat service (2d) Delivery Service - Drop Zone Epic markdown# Drop Zone Pickup System

Technical Acceptance Criteria

  • Seller-defined drop zone locations
  • Location photos and descriptions
  • QR code generation using ZXing
  • QR codes must use AES-256 encryption
  • Scan validation must complete in <200ms
  • Location display with optional Google Maps integration
  • Success rate target: 90% successful QR pickups

Architecture

[See architecture diagram]

Dependencies

  • user-service (for authentication)
  • product-service (for order information)
  • ZXing library (for QR generation)
  • Google Maps API (optional for location display)
  • MongoDB (drop_zones collection)

GitHub

  • Branch: feature/drop-zone
  • Required reviewers: @techLead, @securityReviewer

Tasks

  • [BE] Implement drop zone management API (3d)
  • [BE] Create QR generation with ZXing (2d)
  • [BE] Build QR validation system (3d)
  • [BE] Develop location photo upload (2d)
  • [FE] Drop zone management interface (3d)
  • [FE] QR code display component (2d)
  • [FE] Location selector with optional maps (3d)
  • [FLOW] Integration with checkout flow (2d) Chat Service Epic markdown# Chat System

Technical Acceptance Criteria

  • Two chat modes: Product Chat and Social Feed
  • Real-time messaging
  • Media sharing (photos/videos)
  • Product linking in messages
  • TikTok-style social feed with comments/likes
  • Outfit sharing from fashion module

Architecture

[See architecture diagram]

Dependencies

  • user-service (for profiles)
  • product-service (for product linking)
  • Cloudinary (for media uploads)
  • MongoDB (chats collection)

GitHub

  • Branch: feature/chat-service
  • Required reviewers: @techLead, @performanceReviewer

Tasks

  • [BE] Implement real-time messaging backend (4d)
  • [BE] Create product chat system (3d)
  • [BE] Build social feed with comments/likes (4d)
  • [BE] Develop media sharing API (3d)
  • [FE] Chat interface with product linking (3d)
  • [FE] Social feed UI with infinite scroll (4d)
  • [FE] Media upload component (2d)
  • [FE] Comment and like system (2d)
  • [FLOW] Integration with fashion try-on (2d)
  1. Automation Rules Task Transitions json{ "automations": [ { "trigger": "status_change", "condition": { "status": "Code Review", "list_type": "Service Implementation" }, "action": "create_github_pr", "parameters": { "repo": "{{custom_field.github_repo}}", "title": "{{task.name}}", "description": "{{task.description}}", "branch": "{{custom_field.branch_name}}" } }, { "trigger": "status_change", "condition": { "status": "QA Ready", "task_type": "epic" }, "action": "trigger_test_suite", "parameters": { "suite": "{{task.name}}_tests", "environment": "staging", "notify": ["{{task.assignee}}", "[email protected]"] } } ] } Notifications json{ "notifications": [ { "schedule": "daily", "time": "09:00", "timezone": "EST", "type": "email", "recipients": ["[email protected]"], "subject": "Daily Blocked Tasks Report", "content": { "query": "status:Blocked OR has_dependencies:true", "format": "table", "fields": ["name", "assignee", "blocking_tasks", "days_blocked"] } }, { "trigger": "comment", "condition": { "contains": "@architecture-change" }, "type": "slack", "channel": "#architecture", "content": "Architecture change proposed in {{task.url}}" } ] }
  2. Dashboard Configuration Microservice Progress by Phase json{ "dashboard_type": "stacked_bar", "title": "Project Phase Progress", "data_source": { "space": "PrettyGirlz Dev", "folder": "1. Core Services", "group_by": "phase", "measure": "completion_percentage" }, "series": [ { "name": "Core Architecture", "color": "#4285F4" }, { "name": "User Modules", "color": "#34A853" }, { "name": "Product Modules", "color": "#FBBC05" }, { "name": "Delivery System", "color": "#EA4335" }, { "name": "Chat Features", "color": "#8F44AD" }, { "name": "Testing & Polish", "color": "#2C3E50" } ], "filters": { "date_range": "full_project", "exclude_status": ["Backlog", "Blocked"] }, "refresh_rate": "daily" } Success Metrics Dashboard json{ "dashboard_type": "multi_metric", "title": "PrettyGirlz Success Metrics", "panels": [ { "type": "line_chart", "title": "QR Scan Success Rate", "data_source": { "api_endpoint": "/api/metrics/qr-scan-rate", "time_period": "last_30_days", "interval": "daily" }, "series": [ { "name": "Success Rate", "color": "#4CAF50", "target_value": 90 } ], "annotations": { "deployments": true } }, { "type": "line_chart", "title": "Cart Abandonment Rate", "data_source": { "api_endpoint": "/api/metrics/cart-abandonment", "time_period": "last_30_days", "interval": "daily" }, "series": [ { "name": "Abandonment Rate", "color": "#F44336", "target_value": 5 } ], "annotations": { "deployments": true } }, { "type": "line_chart", "title": "30-Day User Retention", "data_source": { "api_endpoint": "/api/metrics/user-retention", "time_period": "last_90_days", "interval": "weekly" }, "series": [ { "name": "Retention Rate", "color": "#2196F3", "target_value": 75 } ] } ], "refresh_rate": "daily" } Performance Monitoring Dashboard json{ "dashboard_type": "multi_metric", "title": "System Performance Metrics", "panels": [ { "type": "gauge", "title": "Page Load Time", "data_source": { "api_endpoint": "/api/metrics/page-load-time", "aggregation": "p90" }, "thresholds": { "good": { "value": "< 1s", "color": "#4CAF50" }, "warning": { "value": "1s - 2s", "color": "#FF9800" }, "critical": { "value": "> 2s", "color": "#F44336" } } }, { "type": "gauge", "title": "Concurrent Users", "data_source": { "api_endpoint": "/api/metrics/concurrent-users", "aggregation": "max" }, "thresholds": { "good": { "value": "< 300", "color": "#4CAF50" }, "warning": { "value": "300 - 450", "color": "#FF9800" }, "critical": { "value": "> 450", "color": "#F44336" } }, "target_value": 500 }, { "type": "gauge", "title": "Avatar Try-On Load Time", "data_source": { "api_endpoint": "/api/metrics/avatar-load-time", "aggregation": "avg" }, "thresholds": { "good": { "value": "< 300ms", "color": "#4CAF50" }, "warning": { "value": "300ms - 500ms", "color": "#FF9800" }, "critical": { "value": "> 500ms", "color": "#F44336" } } }, { "type": "line_chart", "title": "API Response Times", "data_source": { "api_endpoint": "/api/metrics/api-response-times", "time_period": "last_7_days", "interval": "hourly" }, "series": [ { "name": "user-service", "color": "#4285F4" }, { "name": "product-service", "color": "#34A853" }, { "name": "delivery-service", "color": "#FBBC05" }, { "name": "chat-service", "color": "#EA4335" } ] } ], "refresh_rate": "5min" }
  3. Communication Templates Daily Standup Report markdown# Daily Standup Report: {{date}}

Sprint Progress

  • Planned Points: {{sprint.planned_points}}
  • Completed Points: {{sprint.completed_points}}
  • Remaining Points: {{sprint.remaining_points}}
  • Burndown Status: {{sprint.burndown_status}}

Project Timeline Status

  • Current Phase: {{project.current_phase}}
  • Timeline: Week {{project.current_week}} of 14
  • Phase Progress: {{project.phase_progress}}%

Blocked Tasks

{{#each blocked_tasks}}

  • {{this.name}} (Blocked by: {{this.blocked_by}}) {{/each}}

QA Status

  • Tests Passing: {{qa.passing_tests}}/{{qa.total_tests}}
  • New Bugs: {{qa.new_bugs}}
  • Fixed Bugs: {{qa.fixed_bugs}}
  • Success Metrics:
    • QR Pickup Success Rate: {{metrics.qr_success}}% (Target: 90%)
    • Cart Abandonment: {{metrics.cart_abandonment}}% (Target: <5%)
    • User Retention: {{metrics.retention_30d}}% (Target: 75%)

Today's Focus

{{#each team_members}}

  • {{this.name}}: {{this.current_tasks}} {{/each}} Technical Decision Alert markdown!alert Technical Decision Required

Topic: {{decision.topic}}

Context: {{decision.context}}

Options:

  1. {{decision.option_1}} (Effort: {{decision.effort_1}})

    • Pros: {{decision.pros_1}}
    • Cons: {{decision.cons_1}}
  2. {{decision.option_2}} (Effort: {{decision.effort_2}})

    • Pros: {{decision.pros_2}}
    • Cons: {{decision.cons_2}}

Deadline: Decision needed by {{decision.deadline}} Impact: {{decision.impact}} Project Phase Impact: {{decision.phase_impact}}

@mentions: {{decision.stakeholders}} Weekly Project Timeline Update markdown# PrettyGirlz Project - Week {{project.current_week}} Update

Timeline Overview

  • Project Duration: 14 weeks total
  • Current Week: {{project.current_week}}
  • Current Phase: {{project.current_phase}}

Phase Status

{{#if project.phase_equals "Core Architecture"}} Core Architecture (Weeks 1-2)

  • Microservice foundation: {{tasks.architecture.completed}}/{{tasks.architecture.total}} tasks
  • Database schema: {{tasks.database.completed}}/{{tasks.database.total}} tasks
  • API contract definition: {{tasks.api.completed}}/{{tasks.api.total}} tasks {{/if}}

{{#if project.phase_equals "User Modules"}} User Modules (Weeks 3-5)

  • Authentication: {{tasks.auth.completed}}/{{tasks.auth.total}} tasks
  • Profile management: {{tasks.profile.completed}}/{{tasks.profile.total}} tasks
  • Role-based access: {{tasks.roles.completed}}/{{tasks.roles.total}} tasks {{/if}}

{{#if project.phase_equals "Product Modules"}} Product Modules (Weeks 6-8)

  • Candy store: {{tasks.candy_store.completed}}/{{tasks.candy_store.total}} tasks
  • Fashion store: {{tasks.fashion_store.completed}}/{{tasks.fashion_store.total}} tasks
  • Review system: {{tasks.review.completed}}/{{tasks.review.total}} tasks {{/if}}

{{#if project.phase_equals "Delivery System"}} Delivery System (Weeks 9-10)

  • Home delivery: {{tasks.home_delivery.completed}}/{{tasks.home_delivery.total}} tasks
  • Drop zones: {{tasks.drop_zones.completed}}/{{tasks.drop_zones.total}} tasks
  • QR system: {{tasks.qr.completed}}/{{tasks.qr.total}} tasks {{/if}}

{{#if project.phase_equals "Chat Features"}} Chat Features (Weeks 11-12)

  • Product chat: {{tasks.product_chat.completed}}/{{tasks.product_chat.total}} tasks
  • Social feed: {{tasks.social_feed.completed}}/{{tasks.social_feed.total}} tasks
  • Media sharing: {{tasks.media.completed}}/{{tasks.media.total}} tasks {{/if}}

{{#if project.phase_equals "Testing & Polish"}} Testing & Polish (Weeks 13-14)

  • Integration testing: {{tasks.integration.completed}}/{{tasks.integration.total}} tasks
  • Performance optimization: {{tasks.performance.completed}}/{{tasks.performance.total}} tasks
  • UI polish: {{tasks.ui_polish.completed}}/{{tasks.ui_polish.total}} tasks {{/if}}

Next Milestones

  • {{milestone.next.name}} due on {{milestone.next.date}}
  • {{milestone.upcoming.name}} due on {{milestone.upcoming.date}}

Risks & Mitigation

{{#each project.risks}}

  • {{this.name}}: {{this.mitigation}} {{/each}}

@mentions: {{project.stakeholders}} 6. Validation Checklists Pre-Launch Checklist markdown# Pre-Launch Technical Checklist

Core Services

  • All microservices implement health checks
  • All APIs have Swagger documentation
  • Inter-service communication secured
  • Rate limiting implemented
  • Error handling standardized
  • Comprehensive logging enabled
  • BCrypt password hashing implemented

User Module

  • Admin, Seller, Customer roles fully implemented
  • Registration with email verification working
  • Password recovery system tested
  • Profile management with avatar upload functional
  • Role-based access control verified

Product Module

  • Candy and Fashion product catalogs complete
  • Shopping cart and checkout flows tested
  • Review system with photo upload working
  • Avatar-based virtual try-on functional
  • Outfit sharing to chat verified

Delivery System

  • Home delivery option implemented
  • Drop Zone management for sellers complete
  • QR code generation/validation working
  • Location photos and descriptions supported
  • Seller scanning verification functional

Chat System

  • Product Chat fully implemented
  • Social Feed with comments/likes working
  • Media upload (images/videos) functional
  • Product linking in messages working

Performance

  • Load testing completed (500+ concurrent users)
  • Page load <2s for 90% of requests
  • Database indexes created
  • Cache implementation verified
  • Mobile responsiveness verified

Security

  • Security scan completed
  • Auth tokens properly validated
  • QR data encryption implemented
  • Input validation implemented
  • OWASP Top 10 addressed
  • Data encryption in transit and at rest Success Metrics Tracking json{ "metrics": [ { "name": "QR Pickup Success Rate", "formula": "successful_qr_pickups / total_qr_pickups * 100", "target": "≥ 90%", "current": "{{metrics.qr_success}}%" }, { "name": "Cart Abandonment Rate", "formula": "abandoned_carts / initiated_carts * 100", "target": "< 5%", "current": "{{metrics.cart_abandonment}}%" }, { "name": "30-Day User Retention", "formula": "active_users_after_30d / new_users * 100", "target": "≥ 75%", "current": "{{metrics.retention_30d}}%" }, { "name": "Page Load Performance", "formula": "pages_loading_under_2s / total_page_loads * 100", "target": "≥ 90%", "current": "{{metrics.page_performance}}%" }, { "name": "Concurrent User Support", "formula": "max_concurrent_users_without_degradation", "target": "500", "current": "{{metrics.concurrent_users}}" }, { "name": "API Documentation Coverage", "formula": "documented_endpoints / total_endpoints * 100", "target": "100%", "current": "{{metrics.api_docs_coverage}}%" } ] } Project Timeline Checklist markdown# 14-Week Project Timeline Tracking

Phase 1: Core Architecture (Weeks 1-2)

  • Microservice foundation established
  • Database schema designed
  • API contracts defined
  • Core architecture documented

Phase 2: User Modules (Weeks 3-5)

  • Authentication system implemented
  • Profile management completed
  • Role-based access control working
  • Avatar upload functionality implemented

Phase 3: Product Modules (Weeks 6-8)

  • Candy store catalog and shopping implemented
  • Fashion store catalog implemented
  • Avatar-based try-on system working
  • Review system with photo upload functional

Phase 4: Delivery System (Weeks 9-10)

  • Home delivery implementation completed
  • Drop zone management system working
  • QR code generation and validation functional
  • Location management with photos implemented

Phase 5: Chat Features (Weeks 11-12)

  • Product Chat fully implemented
  • Social Feed with comments/likes working
  • Media sharing functionality completed
  • Outfit sharing integration working

Phase 6: Testing & Polish (Weeks 13-14)

  • Integration testing completed
  • Performance optimization implemented
  • UI polish applied
  • Final QA testing completed