Project Preparation SOP - TREC-Agroecology/lab-wiki GitHub Wiki

  • The following questions should be answered once an experiment or research project is in the process of or has been proposed.
  • Add this template to a wiki page on the project repository as per New Activity Organization

Project Information Overview

  • Project Objectives -
  • Project Description -
  • Project Protocol -
  • Field Design -
  • Field Diagrams -
  • Projected Start Date-
  • Projected End Date-
  • Project Manager(s)-
  • Projected Planting Date-
  • Crop(s)-
  • Irrigation -
  • Applications -
  • Planting methods -
  • Data Collection & Sampling -
  • Project Maintenance -
  • Equipment needed -
  • Field crew assistance -

Land Request

  • Preferred block-
  • Section-
  • Area/Acres requested-
  • Greenhouse -

To Do

Land Preparation

  • Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) -
  • Row Length -
  • In-Row Spacing
  • Between-Row Spacing -
  • Field Buffers -
  • Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) -
  • Transplants? -
  • Support Structure (Rebar, String, etc.) -
  • Plastic Mulch? -
  • Full image of field layout, design, and plot arrangement -
  • Date to complete land preparation -

To Do

Irrigation

  • Drip Tape? (drip placement, emitter spacing, flow-rate GPM/100 ft., etc.) -
  • Solid set? (overhead irrigation, microsprinkler) -
  • Irrigation Timing (frequency and trigger) -
  • Irrigation Amount (per application) -

To Do

Fertilizer Application

  • Label Name -
  • Analysis rates (NPK, etc.) -
  • Application rate per acre -
  • Application method (banded on top of the bed, soil incorporation, etc.) -
  • Application timing and frequency -
  • Lab or field personnel

To Do

Pesticide Application

  • Label Name -
  • Active ingredient(s) and concentration -
  • Application rate per acre -
  • Application method (pre-plant broadcast incorporated, shank or drip applied, etc.) -
  • Application timing and frequency -
  • Lab or field personnel

To Do

  • Worker Protection Standard Training
    • Review "Training Workers and Handlers under the 2016 Revision Requirements" by Frederick M. Fishel.
    • Found in the TREC network Unit drive > TREC Pesticide Use information > WPS information
  • Pesticide request form

Project Maintenance Events

  • Research treatment application -
  • Weeding -
  • Scouting -
  • Sampling -
  • Harvesting and Sampling -
  • Project removal-

To Do

Data Collection & Sampling

  • Database
    • Data type -
    • Data storage -
    • Metadata -
  • Data collection
    • Protocols -
    • Timing -
    • Logistics
  • Sample processing and analysis
    • Protocols -
    • Timing -
    • Logistics -

Contingencies

  • What important decisions are next to be made or remain a challenge?
  • What could possibly go wrong?