Incremental Deliverable 3 - SeoulSKY/safe-zone-system GitHub Wiki
Overview
- Created the MIBS API
- Created the API smoke tests
- Created an authentication module for the MIBS and the CMS micro services
- Created some automated for the MIBS API
- Finished user account registration
Links to Stuff Done During The Deliverable
Presentation
- Presentation
- Presentation for ID 3
Codebase
-
- Branch of the codebase submitted for ID 3
-
- Build instructions for our codebase
-
- Planned and Implemented Smoke Tests
- Updated in ID 3
Documents
-
- What we got accomplished based on our plan from ID 2
- Updated in ID 3
-
- A glossary of all commonly used or confusing terminology used on all the other pages
- Not Updated in ID 3
-
- Log which contains the hours put into the project by the team members
- This was overhauled in ID 3
-
- Document that contains functional and non functional requirements
- Also links to derived requirements from design documents
- Not Updated in ID 3
-
- Defects found within our software and their status
- Updated in ID 3
-
- Design and architecture of the micro services that will compose our software
- Not Updated in ID 3
-
- Mockups for the GUI
- Not Updated in ID 3
-
- Tutorials we made to get people up to speed on technologies that we are using for our project
- Not Updated in ID 3
-
- Our plan for testing our software
- Not Updated in ID 3
-
- All of the risks that we have identified and some contingency and mitigation to stop or reduce their harm if they materialize
- New risks added and existing risks reevaluated in ID 3
-
- Risks from the risk plan prioritized by their risk factor
- Updated base on our risk reevaluation in ID 3
-
- The roles that each of the team members
- Updated in ID 3
-
- Some things that happened during the ID, a follow-up on the stuff from last deliverable, and things that we learned for the next deliverable
- Updated in ID 3
Meetings
Team Meetings
Stakeholder Meetings
Formal Reviews
-
Bathiya
-
Emeka
-
Jeremie
-
Jorgen
-
Josh
-
Lucas
-
Mark
-
Sanhgwoo
-
Spencer
-
Zack
Plan For Incremental Deliverable 4
Incremental Deliverable 4 Plan
Disclaimer
The links on this page are to the master copies of the documents.