Overview

  • For our minimum viable product, we need a lot of different systems to be set up. So we focused our first incremental deliverable on all the setup and infrastructure required so we can start developing and testing the system in for the next Incremental Deliverable.
  • For the first Incremental Deliverable, we:
    • Made tutorials for all of the major technologies we are using
    • Made a spike prototype on mail servers and sending emails
    • Set up a basic CI/CD pipeline(on a separate branch to keep pushing and adding to it, without stopping all other progress in setting up base projects)
    • Set up the base projects for all of the currently planned micro services that will compose our software
      • The web one wasn't finished in time to manually verify that it is working to make it into ID 1
    • Created design, test plan, risk plan, and requirements documents

Links to Stuff Done During The Deliverable

Presentation

Presentation

Codebase

Current Codebase

CI Codebase

Smoke Tests

Documents

Glossary

Activity Log

Requirements Document

Design Documents

GUI Mockups

Tutorials

Test Plan

Top 10 Prioritized Risks

Risk Plan

Team Roles

Lessons Learned

Meetings

Team Meetings

Stakeholder Meetings

Formal Reviews

Plan For Incremental Deliverable 2

Incremental Deliverable 2 Plan

Disclaimer

The links on this page are to the master copies of the documents.