Weekly Progress Logs - SamArmand/Google-Expeditions-Reporter GitHub Wiki

Week 1

Week Behind

Due to my coding skills, I have decided to take a different approach to the HMW question. I effectively started from scratch but I will be using the code done by my former team up until Sprint 2.

This week I:

  • forked my former team’s repository (last commit during Sprint 2) and am using that as my repository.
  • created a progress board using Zenhub which can be viewed in my repository.
  • created a new system diagram.
  • located two wedges.
  • formed 3 user stories based on the system diagram.
  • drew product sketches for 2 of the user stories and converged on a unified user story that includes elements from both.
  • formulated a narrative that I believe sets the scene for the user story.
  • included my goals for the semester.
  • included my development process, although I believe I will be modifying it when I start developing my solution.
  • created an architecture diagram that maps out the main technology components of my solution and two possible rat holes.
    • I already tackled one of the rat holes: networking. I will use a cloud-based solution instead.
    • I have a backup plan in case the second rat hole pops up.
  • listed my stakeholder touchpoints.
  • got myself set up with the code.
    • installed the latest version of Unity.
      • Installed required plugins and add-ons.
    • installed the latest version of Xcode.
    • installed the latest version of Visual Studio Code.
      • Installed required plugins and add-ons.
    • upgraded the solution to work with the latest versions of the above tools.

Week Ahead

This week I will:

  • form the product loop.
  • sketch a storyboard.
  • estimate market size.
  • create a go-to-market strategy.
  • flesh out the TUX map.
  • design (mock up) 2 screens.
    • These will be high-fidelity and I will get started on implementing them.
  • get started with user findings and logs.
  • attempt to complete the homework for this week to the best of my ability.

Weeks 2, 3, and Sprint

2 Weeks Behind

Over the past two weeks, I:

  • formed the product loop.
  • estimated the market size for this product.
  • created a go-to-market strategy.
  • fleshed out a TUX Map for the product.
    • This includes 3 screens for Enter, Engage, and Extend.
  • completed a Sprint.
  • made minor changes to the architecture diagram.
    • I updated the versions of software dependencies.
  • completed a NCP.
    • These are just GIFs for now but will include textual descriptions soon.

Week Ahead

This week I will:

  • complete the NCP description as required.
  • prepare for the final presentation on November 22.
  • include my legacy user findings as well as try to conduct 3 more tests for more findings.
  • complete the punch list.