Week 1
Week Behind
Due to my coding skills, I have decided to take a different approach to the HMW question. I effectively started from scratch but I will be using the code done by my former team up until Sprint 2.
This week I:
- forked my former team’s repository (last commit during Sprint 2) and am using that as my repository.
- created a progress board using Zenhub which can be viewed in my repository.
- created a new system diagram.
- located two wedges.
- formed 3 user stories based on the system diagram.
- drew product sketches for 2 of the user stories and converged on a unified user story that includes elements from both.
- formulated a narrative that I believe sets the scene for the user story.
- included my goals for the semester.
- included my development process, although I believe I will be modifying it when I start developing my solution.
- created an architecture diagram that maps out the main technology components of my solution and two possible rat holes.
- I already tackled one of the rat holes: networking. I will use a cloud-based solution instead.
- I have a backup plan in case the second rat hole pops up.
- listed my stakeholder touchpoints.
- got myself set up with the code.
- installed the latest version of Unity.
- Installed required plugins and add-ons.
- installed the latest version of Xcode.
- installed the latest version of Visual Studio Code.
- Installed required plugins and add-ons.
- upgraded the solution to work with the latest versions of the above tools.
- installed the latest version of Unity.
Week Ahead
This week I will:
- form the product loop.
- sketch a storyboard.
- estimate market size.
- create a go-to-market strategy.
- flesh out the TUX map.
- design (mock up) 2 screens.
- These will be high-fidelity and I will get started on implementing them.
- get started with user findings and logs.
- attempt to complete the homework for this week to the best of my ability.
Weeks 2, 3, and Sprint
2 Weeks Behind
Over the past two weeks, I:
- formed the product loop.
- estimated the market size for this product.
- created a go-to-market strategy.
- fleshed out a TUX Map for the product.
- This includes 3 screens for Enter, Engage, and Extend.
- completed a Sprint.
- made minor changes to the architecture diagram.
- I updated the versions of software dependencies.
- completed a NCP.
- These are just GIFs for now but will include textual descriptions soon.
Week Ahead
This week I will:
- complete the NCP description as required.
- prepare for the final presentation on November 22.
- include my legacy user findings as well as try to conduct 3 more tests for more findings.
- complete the punch list.