5:CONCEPT SELECTION - Q-Div-2022-2023-Odd/Repo-5 GitHub Wiki
PUGH CHART
| DESIGN OBJESCTIVE | WEIGHTS | DESIGN 1 | DESIGN 2 | DESIGN 3 |
|---|---|---|---|---|
| low cost | 3 | 2+ | 1+ | datum |
| installation | 1 | 1- | 0 | datum |
| saftey | 10 | 2+ | 1+ | datum |
| ease of use | 4 | 1+ | 2+ | datum |
| maintainance | 5 | 2- | 0 | datum |
| space | 2 | 2+ | 1+ | datum |
| less weight | 7 | 2+ | 1+ | datum |
| speed | 9 | 1- | 0 | datum |
| score(+) | ------ | 60 | 29 | ---- |
| score(-) | ----- | 20 | 0 | ---- |
| total | ----- | 40 | 29 | 0 |
5.1 JUSTIFICATIONS FOR THE SCORES GIVEN
| objectives | score alloted | justification for score alloted |
|---|---|---|
| low cost | 3 | the price comes around a average cost |
| installation | 1 | installation is done only one time |
| safety | 10 | as it is a machine safety will be our top priority |
| ease of use | 4 | as it is automatic it can be used by knowledge |
| maintenance | 5 | it requires proper maintenance |
| space | 2 | space doesnot required more |
| less weight | 7 | maintaining the low weight of machine is important |
| speed | 9 | as it is automatic machine speed will be high |
5.2 SELECTED DESIGN

5.3 PRODUCT ARCHITECTURE
5.4 FUNCTION CLUSTERING

Subsystems
| sl no | subsysytem |
|---|---|
| 1 | handling unit |
| 2 | moving or sorting unit |
| 3 | releasing |
5.5 INTERACTION BETWEEN THE SUBSYSTEMS
| Subsystems | handling | moving and sorting | releasing | indication |
|---|---|---|---|---|
| handling | ----- | material | --- | ----- |
| moving and sorting unit | ---- | ----- | spatial | ----- |
| releasing | ----- | ----- | ------ | data |