3. Concept evaluation and Selected concept - P-division-2020-2021-even/Repo-08 GitHub Wiki

WEIGHTAGE ASSIGNMENT

Objectives Weights
Safety 9
Ease of use 7
Portability 7
Use of standard parts 5
Cost 8

PUGH CHART

Objectives Weights DESIGN -1 DESIGN -2 DESIGN -3 DESIGN -4
Safety 9 Datum 0 - -
Ease of use 7 Datum + + +
Portability 7 Datum 0 0 0
Use of standard parts 5 Datum + 0 +
Cost 8 Datum - + 0
+ Score 0 12 15 12
- Score 0 8 -9 -9
Total 0 4 6 3

Justification for the scores given

DESIGN NO Objective Score Allocated Justification for the Score
1 Safety Datum Safe to use
Ease of use Datum Easy to use
Portability Datum Portable
Use of standard parts Datum Sensor used is not easily available
Cost Datum Cost of ultrasonic sensor is high
DESIGN NO Objective Score Allocated Justification for the Score
2 Safety 0 similar to the datum
Ease of use + easy as there is a nob system
Portability 0 similar to datum
Use of standard parts + hall effect sensor
Cost - high cost due to hall effect
DESIGN NO Objective Score Allocated Justification for the Score
3 Safety - less safety because of open circuit
Ease of use + easy because of nob handling
Portability 0 similar to datum
Use of standard parts 0 similar to datum
Cost + less because usage of PIR sensor
DESIGN NO Objective Score Allocated Justification for the Score
4 Safety - Less safety because of dc motor
Ease of use + Its easy to use, Simpler in operation
Portability 0 Similar to datum
Use of standard parts + Usage of display
Cost 0 Similar to datum

Selected Concept is Design 3


concept 3


Function cluster

Function cluster

Subsystem List

Sl.no Subsystem
1 Wool storing Unit
2 Wool dispenser Unit
3 Wool winding Unit
4 Indication Unit

Interaction Details

Subsystem 1 Subsystem 2 Subsystem 3 Subsystem 4
Data
Material
Spatial
Subsystem 2 Subsystem 1 Subsystem 3 Subsystem 4
Data
Material
Spatial
Subsystem 3 Subsystem 1 Subsystem 2 Subsystem 4
Data
Material
Spatial
Subsystem 4 Subsystem 1 Subsystem 2 Subsystem 3
Data
Material
Spatial