20201002
Sophie - Rerunning the HeV diffusivity simulations and testing limited diffusion on it. Continuing on the geometric gradation grid.
20201005
Sophie - Continuing on the HeV diffusivity simulations and running 3D NE coupling simulations to look at data transfer time.
20201006
Sophie - Working on HeDTV grouping. Continuing on the geometric gradation grid.
20201007
Sophie - Continuing on HeDTV grouping. Adding solver tests in plsm branch.
20201009
Sophie - Trying to run HeDTV simulations on summit. Checking simulations on Cori.
20201013
Sophie - Starting new dynamic grid simulations on Cori. Working on the grouping for HeV only.
20201014
Sophie - Adding printing information in the plsm branch, testing 3D NE coupling with grain tracker.
20201016
Sophie - Continuing on the factory printing, preparing slides for Xolotl presentation.
20201019
Sophie - Installing plsm branch at ANL and looking at the differences in HeV grouping.
20201020
Sophie - Continuing to install plsm branch at ANL and analyzing the dynamic grid data.
20201021
Sophie - Continuing to test geometric gradation grids.
20201023
Sophie - Thinking of non dilute effects on helium and continuing to time geometric gradation grid simulations.
20201026
Sophie - Installing plsm branch on Cori and starting standard HeV diffusion simulations on Summit.
20201027
Sophie - Trying the vizu at INL and working on TSEventHandler.
20201028
Sophie - Cleaning up the code coupling builds at INL, continuing on the visualization. Starting HeTVI simulations for ITER.
20201030
Sophie - Writing documentation for visu at INL. Running more geometric gradation grid simulations.