June 2020 Morning Status Meetings - ORNL-Fusion/xolotl GitHub Wiki
This page contains a brief summary of the status of the Xolotl development team each morning during the month of June 2020.
20200601
Sophie - Updating dynamic grid results and memory leaks for NE coupling code.
20200602
Sophie - Adding plsm network tests and working on the NE review presentation.
20200603
Sophie - Continuing on plsm network tests and figuring out why checking the GB vectors in coupling gives a segfault.
20200605
Sophie - Cleaning the monitors in plsm branch and analyzing the dynamic grid results.
20200608
Sophie - Adding network specific tests.
20200609
Sophie - Continuing on the network test and subcycling study for NE coupling code.
20200610
Sophie - Re-running the re-solution simulations and continuing the subcycling study.
20200615
Sophie - Looking at MMS for Xolotl NE standalone. Moving nucleation to the plsm network.
20200616
Sophie - Merging master in the MOOSE branch.
20200617
Sophie - Merging MOOSE branch in master and gathering all the subcycling data for NE.
20200619
Sophie - Merging master into plsm branch.
20200622
Sophie - Continuing to test plsm branch.
20200623
Sophie - Using refinement to group clusters properly in plsm branch. Looking at PISCES BPO simulations.
20200624
Sophie - Continuing to group clusters properly in plsm branch (Alloy). Working on convergence study in NE coupling.
20200626
Sophie - Continuing to group clusters properly in plsm branch (Alloy). Checking the sweeping of Xe by GB in NE code coupling.
20200629
Sophie - Continuing to group clusters properly in plsm branch (PSI). Looking at the subcycling in coupled NE simulations.
20200630
Sophie - Analyzing the dynamic grid data. Continuing on the Alloy grouping in plsm branch.