February 2019 Morning Status Meetings - ORNL-Fusion/xolotl GitHub Wiki
This page contains a brief summary of the status of the Xolotl development team each morning during the month of February 2019.
20190201
Sophie - Trying the free GB with oblique geometry again.
20190204
Sophie - Writing a script to plot the temperature map in 2D.
20190211
Sophie - Checking the temperature evolution in 2D and looking at the stuck locations from the ITER runs.
20190212
Sophie - Working on the coupling between Xolotl and MARMOT.
20190213
Sophie - Fixing the flux to the free surface GB. Looking at hydrogen desorption.
20190215
Sophie - Implementing the hydrogen desorption. Testing the coupling between phase field and Xolotl.
20190218
Sophie - Continuing to test the coupling between phase field and Xolotl. Looking at locations with long times in the ITER runs.
20190219
Sophie - Continuing to implement the hydrogen desorption.
20190220
Sophie - Looking at the status of each ITER location from IPS. Finishing to implement the hydrogen desorption.
20190222
Sophie - Checking the performance of 2D PETSc options on 1D heat flux. Investigating the double initialization in the NE coupling.
20190225
Sophie - Extending the PetscDMDAMesh to 3D for coupling with MOOSE.
20190226
Sophie - Testing the PetscDMDAMesh to 3D for coupling with MOOSE.
20190227
Sophie - Starting to read the GB location from MOOSE for Xolotl. Testing He-H grouping with and without moments.