April 2019 Morning Status Meetings - ORNL-Fusion/xolotl GitHub Wiki
This page contains a brief summary of the status of the Xolotl development team each morning during the month of April 2019.
20190401
Sophie - Converting the He ITER data to HeDT data and starting pre-implented simulations.
20190402
Sophie - Continuing to work on the pre-implented simulations and the stuck cases in ITER.
20190403
Sophie - Starting the pre-implented simulations. Looking at what could cause the asymmetry in MOOSE coupling.
20190405
Sophie - Looking at the first results from the pre-implanted simulations. Running Dong-Uk case of residual Xe rate in Xolotl-MOOSE coupling.
20190408
Sophie - Analyzing the data from the Dong-Uk case of residual Xe rate in Xolotl-MOOSE coupling. Checking results from the 800H branch.
20190409
Sophie - Looking at the strange behavior of void diameters from the 800H branch. Continuing on the residual Xe rate in Xolotl-MOOSE coupling.
20190410
Sophie - Continuing to investigate the residual Xe rate in Xolotl-MOOSE coupling. Analyzing the data from ITER pre-implanted cases.
20190412
Sophie - Looking at phase space data for IPS runs. Preparing for meeting with PETSc people.
20190415
Sophie - Preparing slides on Xolotl MOOSE coupling. Checking on IPS runs data.
20190417
Sophie - Adding desorption and bursting tracking to PSI case. Testing uniform grid with heat equation.
20190422
Sophie - Updating the bursting model with hard cut-off depth and minimum helium size. Looking at the NE Booth model.
20190423
Sophie - Starting to compare pre-implanted data to pure tungsten. Continuing to work on the bursting model and data to save (desorption).
20190424
Sophie - Setting up the Booth model case. Continuing to work on saving the surface desorption.
20190426
Sophie - Testing the MOOSE coupling with re-solution. Working on the ITER stuck cases.
20190429
Sophie - Continuing to test the MOOSE coupling with re-solution. Analyzing the ITER pre-implanted data.
20190430
Sophie - Running Booth model with fission rate. Testing PETSc options for stuck ITER runs.