Assembly Arms Base - MARSLab-UTRGV/Drone-Manual GitHub Wiki
STEP 1:
Collect the Power Distribution Board (PDB), the Power Module (PM), and an adapter for the batter (OPTIONAL).
STEP 2:
Attach the connector of the arms to the power distribution board. The position of the arms is important and must match what is shown in the picture above. The PDB is how the arms receive power from the battery.
STEP 3:
Connect the power module to the flight controller. This module is how the controller receives power from the battery.