Ryan Bornhorst 's Weekly Progress - GaryLazerFinz/ECE-411-Capstone-Practicum GitHub Wiki

Week1

  • -Joined a group
  • -Submitted some ideas to the group... water monitoring system, temp controller with fan

Week2

  • -Decided as a group to go with temperature controlled fan
  • -Designed a simple version of this on an arduino board to see what would be required

Week3

  • -Group meeting discussing other modifications we would make to the project
  • -Downloaded EagleCad, trying to learn how to create a simple schematic

Week4

  • -Started soldering some of the components together for a test circuit

Week5

  • -Group meeting about getting components and deciding what controller to use to program the chip
  • -Get dev environment up for programming chip

Week6

  • -Worked on detailed design. Building prototype design w through hole parts.

Week7

  • -Created a preliminary schematic for our design in EagleCad

Week8

  • -Ordered final parts for the BOM for the final design spec
  • -Board layout was submitted to OshPark

Week9

  • -Worked on software design over Thanksgiving break
  • -Project board running using a small motor

Week10

  • -Project working with actual fan attached
  • -Working on presentation