Sprint 1

What Went Well

  • A clear communication channel was established for communication between multiple groups
  • Having a meeting with 2 other teams about our prototypes and how we could successfully integrate with them
  • We were able to partially (frontend only) integrate our prototype with the product listing prototype (5.2)

What Went Wrong

  • We were not able to organize ourselves fast enough to be productive as soon as it was expected
  • We didn't integrate our prototype using pub-sub with any other group's api
  • There were some problems related to our prototype when it came to the frontend connecting to the backend after staying up for a long time

Sprint 2

What Went Well

  • Successfully integrated the jumpseller data with our prototype using pub-sub
  • Improved frontend structure to be coherent with the main website and the POC

What Went Wrong

  • We were not able to integrate the frontend directly on the main website