System business rule specification compensation data input - ESG-Project/documentation GitHub Wiki

← Home / Requirements / Business Rules

This business rule defines the input requirements for the environmental compensation calculation, including automatic population and validation with justification for manual edits.

Rule Details

Field Content
Identification BR19.1
Business Rule Data Input for Compensation
Description Inputs are auto-filled from analysis data but editable with mandatory justification. Includes vegetation, specimen, and location details.
Source System Requirements (RN017.1)
Priority High
Status Active

Implementation Details

  • The system prioritizes automatic population of vegetation data and affected areas from "Phytosociological Analysis" results (BR16, BR17) and a mapping/geoprocessing module (if available).
  • Editable Input Fields:
    • Enterprise Information: Name, Activity Type, Total Investment Value (R$).
    • Location and Legislation: Enterprise State (dropdown), Enterprise Municipality (dropdown, enabled after state selection).
    • Intervention/Suppression Areas (ha): Primary Native Vegetation, Secondary Native Vegetation (Advanced, Medium, Initial stages), APP, Wetland/Humid Areas, Consolidated Field/Anthropized Area.
    • Detailed Specimen Data for Suppression (DBH $\ge$ 8cm): Total Native Individuals, Total Exotic Individuals (non-invasive), Total Volume of Woody Material (m³t) from Understory Clearing (< 15 cm DBH).
    • Protected/Threatened Species to Suppress: Interface to list each threatened species (Scientific Name, Common Name, MMA Status, State Status) and quantity.
    • Conservation Measures Already Provided: Area of Native Vegetation Maintained Above Legislation Requirements (ha, categorized by successional stage).
  • Input Validation: All input fields are validated, ensuring numerical consistency and expected format, with clear error messages.
  • Edit Justification: Manual edits to automatically populated fields require a mandatory "Justification for Manual Change."

Related Components

  • Data Input Forms
  • Analysis Data Integration
  • Geoprocessing Integration (if applicable)
  • Validation Engine

History

Version Date Author Changes
1.0 2025-07-30 Gemini Initial version (extracted from BR19)

Notes

  • Ensures data accuracy and accountability for manual overrides.

Related Documents