DSB Maintenance Iteration 23: Agenda (11 June 2025) - ConsumerDataStandardsAustralia/standards GitHub Wiki

Meeting Details

Housekeeping

Recording

Maintenance Iteration Calls are recorded for note taking purposes only. Recordings and transcripts are kept securely. No identifying material will be provided without the participant's consent, participants agreeing to take an action is taken to be consent for the purpose of the meeting notes. Participants may email [email protected] with questions or to request material be redacted from the record.

Acknowledgement of Country

We acknowledge the Traditional Custodians of the various lands on which we work today and the Aboriginal and Torres Strait Islander people participating in this call.

We pay our respects to Elders past and present and recognise and celebrate the diversity of Aboriginal peoples and their ongoing cultures and connections to the lands and waters of Australia.

Time management of Maintenance Iteration Meetings (if required)

  • After the first meeting to groom the backlog, if the number of candidates and the anticipated complexity of them indicates timeboxing discussions is required, these time management practices will be put in place:
    • 5 minute delay will be removed. Meetings will commence at 2:00PM AEST.
    • Each discussion will be timed, if the discussion is not concluded within the allotted time, the discussion will be taken offline.
      • Allotted time will be determined based on the number of candidates in the iteration.
      • If the discussion on all issues has concluded and time remains, any issues scheduled for offline discussion can be revisited.
    • Start times will be estimated for each Domain and advertised when the Agenda is published.

Agenda

  • 15 min
    • Introductions
    • Release Plan
  • 100 min
    • Requirements Analysis
    • MI23 Candidates
  • 5 min
    • Any other business

Introductions

The purpose of this meeting is to continue discussion on requirements for MI23 Candidates, with a view to proposing solutions for consideration.

Release Plan

  • The current version is 1.34.1, published on 11 April 2025.
  • The Explanatory Document and Consultation Draft - #364 - on standards changes arising from MI 22 have been released for consultation. The closing date for feedback is 3 July. The changes will published in version 1.35.0.
  • Changes arising from this MI will be published in version 1.36.0 or later.

Requirements Analysis

Domain # Issue Comments
Energy 662 Extend Get Generic Plan Detail to include a new field: tariffCode Waiting on Policy advice
Alternate solutions welcomed
Banking TBA ACTION: DSB to review issues #283, #284, #567 and #569 to determine the best way to proceed.
Banking 692 ISO 8601 - Home Loan Repayments
Banking 697 Commercial Credit Card Structure under Get Account Details

MI23 Candidates

Domain # Issue Comments
MI23 690 Maintenance Iteration 23 Holistic Feedback
ACTION: CBA to respond on DSBs proposed description to resolve the documentation fixes.
CX 684 CX Guidelines - ADI or NBL to hold CDR data as a DH
CX 691 CX Guidelines - Expanding Amending BCDC CX Guidelines
CX 693 CX Guidelines - Historical date ranges for Authorisations
Register 679 Update SSA specification
ACTION: DSB is seeking feedback from Data Holders on any impacts arising from the ability to modify the legal entity ID and legal entity name in DCR requests.
ACTION: DSB to post details of proposed changes on SSA requirements on the issue for further discussion.
Register 665 Review Register error code documentation
Register 695 Digicert Certificate Trust Chain Migration
ACTION: ACCC to consider proposal to remove certificate details from the standards for further discussion in the next meeting.
NFR 660 Revise the Availability Requirements NFRs
Energy 686 Superfluous timeZone property for EnergyPlanTariffPeriod schema
ACTION: DSB welcomes views on justification for retaining the field from the Energy Sector.
Banking 687 Bank account balance calculation time is indeterminate Dependent on issue #656
Banking 688 BankingBalancePurse currency field is optional
Banking 694 Add a Card identifier to the Transaction endpoint
ACTION IN PROGRESS: CBA and ANZ agreed to investigate their systems to advise what might be possible.
Banking 173 Behaviour where posted transactions only have an associated date
ACTION: SISS and Skript to email [email protected] with details of DHs that will likely be impacted by guidance changes.
Documentation 668 Review References detail

NOTE: As the Iteration progresses, to allow standards maintenance consultation to focus on the detail of unresolved issues, it is assumed that proposed solutions can be taken forward in a Decision Document for the Chair unless there are opposing views raised before the final call of the iteration. The DSB encourages participants to post their views on issues as early as possible.

Issue to be closed

Domain # Issue Comments
Energy 680 Jurisdiction Code of ISO This issue does not require discussion, explanation available in 14 May Meeting Notes

Any other business

Participants are invited to raise topics related to the Data Standards that would benefit from the groups' consideration.

Time permitting, discuss meeting reminders: Are you getting too many?

Useful Links

View a number of informative and useful links in the Consumer Data Standards Guide on Information Links.

Data Standards Body Consumer Data Right Digital ID Contact & Media
Chair Standards Accreditation Standards Website
News Maintenance Iteration AGDIS Standards Email
Advisory Committee CX Guidelines Calendar
Support Portal LinkedIn
YouTube
GitHub
Newsletter
⚠️ **GitHub.com Fallback** ⚠️