BootycallJones' Linear Rail Gantry - Chinstrap777/Chinstrap_3DP_Reference GitHub Wiki
Model
BootycallJones' Linear Rail Gantry
Information
- This mod requires the installation of BootycallJones' A/B Motor Mounts and Tensioners from the Flanged Bearing Gantry Project
- You will lose about 10 mm of Y travel.
- Link to Discord Channel for this mod
BOM
Carriage:
2x - M2x4x3.5 heated inserts
14x - M3x4x5 heated inserts
1x - M3x40 FHCS (securing bolt that replaces the top rod)
4x -M3x6 or M3x8 FHCS (fasten MGN12H carriage to printed part)
2x - M3x6 BHCS or SHCS (cable clip)
XY joint extra hardware:
2x - M6x10 grub/set screw
Rail +Carriage:
1x - 320mm (K1) or 400mm (K1Max) MGN12 rail
1x - MGN12H Carriage
These can be purchased as a bundle globally from AliExpress:
K1 or K1Max
NOTE: Specify Z1 or Z2 Preload in a note to the supplier when you are ordering
Print Setting Recommendations
Parameter | Setting |
---|---|
Material | ASA |
Layer Height | 0.2 |
Perimeters/walls | 0.6 |
Top/Bottom | 1 mm |
infill | 50% |
supports | tree |
Brim | 8 mm |
INSERT ORIENTATION PREVIEW HERE
Assembly \ Installation
-
Linear Rail Preparation
- Remove the carriage from the rail
- Lay the rail/carriage face down on a table.
- Remove one of the carriage stops and set it aside.
- Carefully remove the rail from the carriage by sliding it off. The bearing balls should remain in the carriage. video
- Clean the components
- Soak the carriage and rail in IPA to remove all of the shipping protectant for 24 hours.
- Wipe and fully dry the components.
- Assemble the carriage
- Place the bearing balls back into the carriage. If you lost some, or need more preload the rails listed use 3/32 solid chrome steel bearings (G25). NOTE: Add/remove bearing balls so that the rail almost moves freely under its own weight or only needs minimal force to move.
- Lubricate the components
- Use a lubricant that is recommended for linear rails and will withstand the expected chamber temperatures.
- Carefully force the lubricant into the bearings, cycling them until well lubricated.
- Install the carriage onto the rail.
- Loosen the wiper screws on each side and position them so they clear debris from the rail, but don't cause additional friction.
- Tighten the wiper screws so they remain in the optimal position.
- Wipe any excess lubricant off of the carriage and rail.
- Remove the carriage from the rail
-
X Carriage
- Install the 2 ea. M2x4x3.5 heat inserts on the bottom for mounting the heatbreak.
- Install the 14 M3x4x5 heated inserts. NOTE: Install Heat inserts using a soldering iron at 260C.
-
- Follow the guide.
- Install the rail into the XY Joints.
- Install the 2 ea. M6 grub screws from the top to secure the rail to the joints.
- FINISH INSTRUCTIONS