BANCS |
Bank Assessment for NPS Consequences of Sediment |
BEHI |
Bank Erosion Hazard Index |
BMP |
Best Management Practices |
CAST |
Chesapeake Assessment Scenario Tool |
CBP |
Chesapeake Bay Program |
CBWM |
Chesapeake Bay Watershed Model |
EHZ |
Effective Hyporheic Zone |
FR-LSR |
Floodplain Restoration: Legacy Sediment Removal |
FR-RSB |
Floodplain Restoration: Raising the Stream Bed |
FRV |
Floodplain Reconnection Volume |
FTZ |
Floodplain Trapping Zone |
HA |
Hyporheic Aquifer |
HEZ |
Hyporheic Exchange Zone |
HTZ |
Headwater Transition Zone |
LEC |
Limited Erosion Control |
LSR |
Legacy Sediment Removal |
MS4 |
Municipal Separate Storm Sewer System |
NBS |
Near Bank Stress |
NCD |
Natural Channel Design |
OGSP |
Outfall and Gully Stabilization Projects |
RR |
Runoff Reduction |
RTVM |
Reporting, Tracking, Verification and Monitoring |
RSC |
Regenerative Stormwater Conveyance |
TMDL |
Total Maximum Daily Load |
TN |
Total Nitrogen |
TP |
Total Phosphorus |
TSS |
Total Suspended Solids |