Test Plan Results - CankayaUniversity/ceng-407-408-2020-2021-Monitoring-System-of-Water-Quality-and-Efficiency-of-Wastewater-Treatment GitHub Wiki

Test Results

Individual Test Results

Tables of Individual Test Results

TC ID Priority Date Run Run By Result Explanation
UI.LG.BT.01 H 27.05.2021 Oğuzhan Saltık Pass User logged in.
UI.LG.BT.02 M 27.05.2021 Oğuzhan Saltık Pass Error message shown.
UI.LG.BT.03 H 27.05.2021 Oğuzhan Saltık Pass User logged in and directed to the Decision Maker page.
UI.LG.BT.04 H 27.05.2021 Oğuzhan Saltık Pass User logged in and directed to admin page.
UI.LG.BT.05 H 27.05.2021 Oğuzhan Saltık Pass User logged in and directed to the Data Entry page.
TC ID Priority Date Run Run By Result Explanation
DM.NVB.LG L 26.05.2021 Oğuzhan Saltık Pass Returned to the welcome page.
DM.NVB.LO H 26.05.2021 Oğuzhan Saltık Pass User logged out and returned to login page.
DM.NVB.AK H 26.05.2021 Oğuzhan Saltık Pass Dropdowns appeared according to the selected water type.
DM.NVB.DN H 26.05.2021 Oğuzhan Saltık Pass Dropdowns appeared according to the selected water type.
DM.NVB.GL H 26.05.2021 Oğuzhan Saltık Pass Dropdowns appeared according to the selected water type.
DM.NVB.AR H 26.05.2021 Oğuzhan Saltık Pass Dropdowns appeared according to the selected water type.
DM.SRC.BL H 26.05.2021 Oğuzhan Saltık Pass Options appeared according to the selected water type.
DM.SRC.YR.01 H 26.05.2021 Oğuzhan Saltık Pass Options appeared according to the selected location.
DM.SRC.YR.02 L 26.05.2021 Oğuzhan Saltık Pass No option showed up.
DM.SRC.PR.01 H 26.05.2021 Oğuzhan Saltık Pass Options appeared according to the selected place.
DM.SRC.PR.02 L 26.05.2021 Oğuzhan Saltık Pass No option showed up.
DM.SRC.YL.01 H 26.05.2021 Oğuzhan Saltık Pass Options appeared according to the selected parameter.
DM.SRC.YL.02 L 26.05.2021 Oğuzhan Saltık Pass No option showed up.
DM.SRC.YL.03 M 26.05.2021 Oğuzhan Saltık Pass After selecting second year, two years showed as selected.
DM.BR.BT.01 H 26.05.2021 Oğuzhan Saltık Pass Bar graph of the selected values showed up.
DM.BR.BT.02 H 26.05.2021 Oğuzhan Saltık Pass Bar graphs of the selected values showed up for every parameter.
DM.BR.BT.03 H 26.05.2021 Oğuzhan Saltık Pass Bar graph of the selected values showed up that shows values of every year.
DM.CZ.BT.01 H 26.05.2021 Oğuzhan Saltık Pass Line graph of the selected values showed up.
DM.CZ.BT.02 H 26.05.2021 Oğuzhan Saltık Pass Line graphs of the selected values showed up for every parameter.
DM.CZ.BT.03 H 26.05.2021 Oğuzhan Saltık Pass Button is disabled.
DM.TB.BT.01 H 26.05.2021 Oğuzhan Saltık Pass Button is disabled.
DM.TB.BT.02 H 26.05.2021 Oğuzhan Saltık Pass Table of the selected values showed up.
DM.TB.BT.03 H 26.05.2021 Oğuzhan Saltık Pass Button is disabled.
TC ID Priority Date Run Run By Result Explanation
DE.NVB.LG L 26.05.2021 Oğuzhan Saltık Pass Returned to the welcome page.
DE.NVB.LO H 26.05.2021 Oğuzhan Saltık Pass User logged out and returned to login page.
DE.NVB.AK H 26.05.2021 Oğuzhan Saltık Pass Dropdowns appeared according to the selected water type.
DE.NVB.DN H 26.05.2021 Oğuzhan Saltık Pass Dropdowns appeared according to the selected water type.
DE.NVB.GL H 26.05.2021 Oğuzhan Saltık Pass Dropdowns appeared according to the selected water type.
DE.NVB.AR H 26.05.2021 Oğuzhan Saltık Pass Dropdowns appeared according to the selected water type.
DE.LC.IN H 26.05.2021 Oğuzhan Saltık Pass Options appeared according to the selected water type.
DE.PR.IN.01 H 26.05.2021 Oğuzhan Saltık Pass Valid values entered.
DE.PR.IN.02 H 26.05.2021 Oğuzhan Saltık Pass Warning message about the value being invalid showed up.
DE.SB.BT.01 H 26.05.2021 Oğuzhan Saltık Pass Success message is shown under the button.
DE.SB.BT.02 H 26.05.2021 Oğuzhan Saltık Pass Error message is shown under the button.
TC ID Priority Date Run Run By Result Explanation
AD.US.AD.01 H 26.05.2021 Oğuzhan Saltık Pass New user created.
AD.US.AD.02 H 26.05.2021 Oğuzhan Saltık Pass “Please correct the error below” message showed up.
AD.US.UP.01 L 26.05.2021 Oğuzhan Saltık Pass “The user was changed successfully.” message showed up.
AD.US.UP.02 H 26.05.2021 Oğuzhan Saltık Pass “Please correct the error below” message showed up.
AD.US.DL M 26.05.2021 Oğuzhan Saltık Pass “The user was deleted successfully.” message showed up.
AD.LC.AD.01 H 26.05.2021 Oğuzhan Saltık Pass “The location was added successfully.” message showed up.
AD.LC.AD.02 H 26.05.2021 Oğuzhan Saltık Pass “Please correct the error below” message showed up.
AD.DT.UP.01 M 26.05.2021 Oğuzhan Saltık Pass Admin updated the data.
AD.DT.UP.02 H 26.05.2021 Oğuzhan Saltık Pass “Please correct the error below” message showed up.
AD.DT.DL M 26.05.2021 Oğuzhan Saltık Pass “The data was deleted successfully.” message showed up.

Summary of Test Results

All of the test cases have been executed and evaluated.

Priority Number of TCs Executed Passed
High 34 34 34
Medium 4 4 4
Low 6 6 6
Total 44 44 44

Exit Criteria

Criteria Result
%100 of the test cases are executed Met
%95 of the test cases are passed Met
All High (H) and Medium (M) priorities of test cases passed Met