Product Backlog - CMPUT301W24T42/EventGate GitHub Wiki

We have frozen the issues in the backlog below.

Each issue specifies acceptance criteria that must be met before closing the issue.

Each issue specifies unknowns that should be determined before starting work on the issue.

Story points are allocated from 1 to 5.

Risk is assigned using values Low, Medium and High.

Links to all issues and the half-way milestone here.

Issue Records

US 01 01 01

US 01 01 02

US 01 02 01

US 01 03 01

US 01 04 01

US 01 05 01

US 01 06 01

US 01 07 01

US 01 08 01

US 01 09 01

US 01 10 01

US 01 11 01

US 02 01 01

US 02 02 01

US 02 02 02

US 02 02 03

US 02 03 01

US 02 04 01

US 02 05 01

US 02 06 01

US 02 07 01

US 02 08 01

US 02 09 01

US 03 02 01

US 04 01 01

US 04 02 01

US 04 03 01

US 04 04 01

US 04 05 01

US 04 06 01

Halfway Checkpoint