Milestone Report for Sprint #4

PROJECT PLANNING AND HIGH LEVEL ARCHITECTURE FORMATION (CLOSED ON 10TH OF APR)

This milestone consists of the issues stated below:

  1. High Level Design
  2. Create Base Project in Spring Framework
  3. Create Base UI Project
  4. Project Plan Design

A brieft summary about the milestone could be also found below:

High level architecture and design are created for the project. And the base UI and application is created for the web.

1. High Level Design (Closed on 17th of March)

High level UI/UX design is done. Draw.io tool is used for design the page as mock-up. Some design issues are discussed as a part of that.

2. Create Base Project in Spring Framework (Closed on 20th of March)

Base project is created and submitted to the repository. Spring Framework is used for the project. This part will form the back-end side of the project.

3. Create Base UI Project (Closed on 31th of March)

Base UI project is created based on high level design decisions. HTML, CSS and JS is used for web design. Angularjs2 is used for front-end part of the project. Base project supports general structure of Angularjs2 and has basic authentication and navigation features.

4. Project Plan Design (Closed on 10th of April)

Firstly, big blocks for the project are decided. And then these big blocks divided into smaller parts and details of the project plan is designed. GanttPro tool is used for design the project with giant chart. Milestones and sprints are decided and clarified in detailed.

Sign in credentials:

e-mail: [email protected] password: Herodot2017

GanttPro Link: https://app.ganttpro.com/#!/app/home

All the issues has been commented on and discussed on Github as a team.

Next Milestone: Sanity Check With Registration Prototype