Iteration 1 Plan - AvengerDisassemble/KU-connect GitHub Wiki

Iteration 1 Plan

Goals

  • Establish project foundation and clarify key concepts for all team members.
  • Gather and finalize requirements with stakeholders to ensure alignment.
  • Design high-level system architecture and select appropriate technology stack.
  • Perform project planning, resource allocation, and team role assignments.

Features

  • Conduct stakeholder meetings for requirement gathering.
  • Document finalized requirements and project vision.
  • Design system architecture with diagrams/models.
  • Select technology stack and tools for development.
  • Set up initial development environment (repositories, CI pipelines, etc.).
  • Assign team roles and responsibilities.
  • Perform high-level risk assessment.

Milestones

Milestone Status
Stakeholder meetings completed with finalized requirements documentation Achieved
System architecture design established with technology stack selected Achieved
Project planning and resource allocation confirmed with team role assignments Achieved

Acceptance Criteria

  • Requirements documentation is reviewed, approved, and versioned in the repository.
  • System architecture diagram(s) and technology stack list shared with all team members.
  • Project plan with timelines, resource allocation, and risk assessment published and accessible.
  • Development environment is successfully set up and verified by the team.
  • All team roles and responsibilities are clearly defined and communicated.