Install Required Hardware (ADRV9371) - ArrowElectronics/arrow-adi-intel-psg GitHub Wiki
The ADRV9371 Evaluation Platform is comprised of three (3) components:
- Analog Devices ADRV9371-W/PCBZ data converter board
- Critical Link MitySOM®-A10S development kit p/n: 80-001201 (includes MitySOM-A10S SOM p/n: 80-001124, Fansink, Ethernet cable, and AC/DC 12V@5A Power Supply)
- (2) 9" RG316 SMA RF Cable
- Remove the backing from the underside of the heatsink to expose the thermal pad.
- Position the fansink on the Arria® 10 with the 2-clip side closest to J3, the fan header. Make sure the 2-clip feet are under the FPGA.
- Insert the 2-tab side of the provided fansink tool into the available slots on the clip and pull the handle up while pressing the clip down until it clicks under the FPGA.
- Plug the fan into J3.
● Plug the ADRV9371 board
into the FMC (J300) connector on the Critical Link carrier card.
● Make sure the POWER switch
is in the OFF position.
● Connect the 12VDC power source
to P700 of the Critical Link Carrier board
● Connect the Ethernet cable
between J400 and a PC
● Connect the microUSB cable
between J600 and a PC
● Connect an RG316 SMA RF Cable between J306
and J201
of the ADRV9371® board.
● Connect an RG316 SMA RF Cable between J305
and J200
of the ADRV9371® board.
● Ensure that the BOOT MEDIA
slide switch S200 is in the uSD position.
● Prepare the microSD card containing the software image and plug it into the slot on the bottom side of the SOM board 
● Slide the POWER switch
to the ON position.
Next- Install Required Software
Return to Quick Start Guide Table of Contents