Install Required Hardware (ADRV9009) - ArrowElectronics/arrow-adi-intel-psg GitHub Wiki

Install Required Hardware

The ADRV9009 Evaluation Platform is comprised of two (2) components:

Assemble the Hardware

  • Install the included Fansink

  1. Remove the backing from the underside of the heatsink to expose the thermal pad.
  2. Position the fansink on the Arria® 10 with the 2-clip side closest to J3, the fan header. Make sure the 2-clip feet are under the FPGA.
  1. Insert the 2-tab side of the provided fansink tool into the available slots on the clip and pull the handle up while pressing the clip down until it clicks under the FPGA.
  1. Plug the fan into J3.
  • Rework the ADRV9009 board

  1. Rotate C804 90 degrees to C802 position
  2. Rotate C803 90 degrees to C801 position



    ●  Plug the ADRV9009 board into the FMC (J300) connector on the Critical Link carrier card.

    ●  Connect the 12VDC power source to P700 of the Critical Link Carrier board

    ●  Connect the Ethernet cable between J400 and a PC

    ●  Connect the microUSB cable between J600 and a PC

  • Connect an RG316 SMA RF Cable between J304 6 and J202 7 of the ADRV9009 board.

  • Connect an RG316 SMA RF Cable between J303 8 and J201 9 of the ADRV9009 board.



    ●  Ensure that the SOM POWER slide switch is in the 5V position.

    ●  Ensure that the BOOT MEDIA slide switch S200 is in the uSD position.

    ●  Prepare the microSD card containing the software image and plug it into the slot on the bottom side of the SOM board.

    ●  Slide the POWER switch to the ON position.





Next- Install Required Software

Return to Quick Start Guide Table of Contents

⚠️ **GitHub.com Fallback** ⚠️