docs release evidence p29 catalog exit - AlexandreZanata/Abastevo GitHub Wiki
P29 â Catalog capacity and refreshed Android acceptance: execution record
Current state
- Definition commit and task range: plan
0067e86; P29-T01 â P29-T02 â P29-T03 oncodex/phase-29-catalog-acceptance. - Publication scope: LOCAL_ONLY. Branch backup pushes only; no PR, CI wait, merge, deploy or wiki at this boundary (ADR-018).
- Repository / base SHA / phase branch / worktree:
brazil-fuel-prices/ basedd0579f(P27 checkpoint) /codex/phase-29-catalog-acceptance/.worktrees/abastevo-project-batch-flow. - Milestone / task issue IDs / optional final batch PR: task IDs P29-T01âŠT03 per ROADMAP/STATION_CATALOG_PLAN; P28 unselected; no per-phase PR by ADR-018 (cumulative batch PR only at final closure).
- Next task and blockers: P30 (
codex/phase-30-station-profilesvia--from-checkpoint); full-scale national calibration + live/device rows owed downstream. - Integration status and tested head/base: INTEGRATION_PENDING after checkpoint; tested head
541c657/ basedd0579f. - Wiki source SHA, owned-manifest version, remote commit/status: no wiki sync at phase boundary (final closure only).
- Release status (not implied by phase integration): G09 UNCERTIFIED; no production deployment/tag/pilot; iOS archived.
Task evidence
- P29-T01 (
1304399): capacity campaign with frozen budgets (simulation, no SLA). Record:docs/release-evidence/p29-t01-capacity.md. - P29-T02 (
0622cf8): source-to-app lifecycle + reacceptance mapping (device rows owed). Record:docs/release-evidence/p29-t02-lifecycle.md. - P29-T03 (
541c657): pinned candidate + production handoff. Record:docs/release-evidence/p29-t03-candidate.md.
Local phase checkpoint
Use only after required local task/specialized exit acceptance passes:
Status: LOCAL_DONE Validation: PASS
- Tested behavior revision/tree and actual commands/results: head
541c657(clean). Backend directory + account/feedback/moderation/evidence/privacy unit+-racePASS; real-PostGIS-race -tags=integrationdirectory + privacy PASS;sqlc vet+generateclean;go build ./...PASS; Android:domain :application :data :app+:app:assembleDebugPASS;vacuum lint+apicontract+check-compat.shPASS;git diff --checkPASS;scan-secrets.shPASS. - Checkpoint head (private helper state; do not require this file to contain its own commit SHA):
- Parent phase checkpoint / next authorized phase: base P27 checkpoint
dd0579f/ P30codex/phase-30-station-profiles. - Integration: PENDING until actual final batch merge.
- Deferred manual/device/production obligations: end manual/device batch OWED (P38-T02 matrix + catalog rows); provider/media/export-implementation OWED; full-scale national calibration OWED; G09 production certification deferred â never fabricated PASS.