docs mobile p38 t03 candidate handoff - AlexandreZanata/Abastevo GitHub Wiki
P38-T03 — Candidate, final integration and G09 handoff
Status: LOCAL_DONE on codex/phase-38-app-acceptance. Task: P38-T03.
Records the actual P34–P38 source scope, trust state and launch
blockers. Required final PR/CI/reviews/merge/wiki happen at complete
project batch closure (after the selected catalog/profile phases), not
here; G09 certification remains its own gate afterward.
Candidate scope (code-ready, INTEGRATION_PENDING)
- Base: P34 checkpoint
6e032d7→ P35 (48f456b,b284ca2,567f9c0, exitc5da7f6) → P36 (9efd2d5,0ed3d17,c04fb0d, exitfd5cb7a) → P37 (8545440,75e0c01,368597f, exit72cdc24) → P38-T01 (7e274d3) + P38-T02 (this branch head). - Deltas: canonical Directory UUID ports/cache/gateway + flag-gated
server discovery/detail/nearby in Explore; staging origin guard;
UUID discussion section; session-bound discussion account; contextual
capture + outbox submit; 19 en/pt-BR strings; 9 evidence docs + 4
exit records. No backend migration, no new service, no dependency
added;
com.anpfuel, MIT notices, KMP ports, expert/offline tools and brand preserved. - Config: staging origin
https://teste.abastevo.com.brvia sharedApiEnvironment.STAGING; all feature flags default OFF (rollback OFF); release target explicit and separately certified — the test origin must never ship as production. - Fixtures:
contracts/testdata/p34/catalog.jsonv1 (3 owned[P34-TEST]stations + 9 exercise cases), NOT SEEDED; population explicitly unclaimed.
Trust and blocker state
- TLS: staging chain unverified from this runner (Fortinet middlebox
CA
FG6H0FTB23902129,curl60) — BLOCKED_LIVE, not an outage diagnosis; no bypass shipped. - Providers: email/Google/Apple delivery + client IDs + callbacks OWED (no creds in Git, verified).
- Storage: no attached VPS private media — photo journey BLOCKED_MEDIA (isolated 24h matrix green).
- Export endpoint: contract frozen, implementation OWED.
- Manual/device: full matrix OWED per P38-T02 (directive: after all selected source phases).
- Catalog/profile: P25 → P26 → P27 → P29 → P30 → P31 → P32 → P33 remain PLANNED (P28 optional); their affected-device rows join the end batch.
Handoff
- Next authorized phase: P25 (
codex/phase-25-national-registryvia--from-checkpoint) after this P38 checkpoint. P25 entry needs the reconciled P38 source checkpoint recorded here. - Final integration (ADR-018) runs once at complete project batch closure: acceptance union (incl. owed manual/device batch) → cumulative PR → required current Quick verification/reviews → guarded merge preserving task commits → owned wiki mirror once.
- G09 then owns real-production TLS/storage/off-host restore/load/ privacy certification; the staging domain never releases the app and never authorizes a public pilot (P10-T09 waits for G09 RELEASE_CERTIFIED; P11 stays optional; iOS stays archived).
Validation
- P38-T01 regression sweep green (see its record); T02 matrix planned; this handoff is docs-only on top of the tested tree.
git diff --checkPASS;scan-secrets.shPASS.
Limits
- Code-ready is not acceptance; no release, deployment, tag, pilot or production claim follows from this checkpoint.