docs backend evidence community safety SEC09E_PROTECTED_DELIVERY - AlexandreZanata/Abastevo GitHub Wiki
SEC09-E — Final protected delivery (push; merge gated on green)
Date: 2026-10-11. Status: LOCAL_DONE / INTEGRATION_PENDING (push done
or recorded below; merge only with green required checks). Head:
maintained dev + this task.
Plan: remediation plan
(SEC09). Contract: ADR-020 maintained-dev → protected-main PR;
existing PR #129 reused (no second PR); guarded merge preserving
commits via git-flow.sh finish --required "Quick verification";
one allowlisted merged-SHA wiki mirror after merge. Constraint: no
force-push, no direct main push, no merge without green required
checks, no CI polling; G09/G24/live statuses stay distinct.
Validation: PASS (delivery mechanics; remote checks pending)
Delivery record
- Remote moved to
github.com:AlexandreZanata/Abastevoper handoff; localoriginrepointed frombrazil-fuel-pricestoAbastevo(git remote set-url) sogit push origin devupdates Abastevo PR #129. Pre-push verified: Abastevodev=47b5464== ancestor of localdev→ fast-forward, no force. - Pushed: local
dev(SEC01-D → this task, 34 commits incl. SEC09-E) toorigin/dev. Excluded from every commit (verified per commit viagit diff --cached --name-only): the dirtyAI_TRAINING_IMAGE_CONSENT_PLAN.md(another effort's) and all untracked planning/audit files — they stay local-only. - PR: https://github.com/AlexandreZanata/Abastevo/pull/129
(dev→main, reused). Merge: ONLY after required
Quick verificationis green at the pushed head, via the finish helper; then one wiki mirror of the merged SHA. No merge performed here (checks pending).
Validation (actual)
- Pre-push:
git statusreconciled (only the known foreign-dirty + untracked planning files outstanding, none staged); fetch clean; ancestor check OK;git diff --checkclean. - Full batch evidence: SEC06-E→SEC09-D docs + PROGRESS entries; SEC09-A/B/C gates green at their heads.
Owes (tracked, block nothing local)
- Remote
Quick verification+ reviews on PR #129 (pending; no poll). - SEC05-E every-copy soak proof due after 2026-10-12T19:11:39Z
(containers
sec05e-soak-pg:32777 +sec05e-soak-minio:32778 left running); CS10C training soak due after 2026-10-12T16:11:11Z. - SEC08-D phone matrix (needs authorized device+window).
- Identity edge Caddy test (host port 18081 squatted; pre-existing).
- Wiki mirror + G09/G24/live gates after merge.
Limits
- LOCAL_DONE, INTEGRATION_PENDING — not certified, not live. No production claim.
Next action: watch PR #129 checks (no polling loop); merge via the finish helper when green; mirror wiki once; then run the due soak proofs in their windows.