access_UMTIPBoMWorkingTable - ACCESS-NRI/accessdev-Trac-archive GitHub Wiki

PageOutline

UM Partnership Technical Infrastructure Collaboration Project -- BoM Contribution Working Table

Revision status

  • [Michael Naughton 11/05/2020] Work in progress: This page is being updated with draft version of BoM 2020-21 plans. 2019-20 and other previous years plans are at link below.

2020-21 BoM Contribution Working Table

Bureau contributions for each work package, and division into Collaboration Development (CD) and Local Implementation (LI) components. Notes below will record material differences between these plans and figures in UMTIP Project plan docs maintained by Met Office UMTIP Project Manager.

2019-20 Bureau contributions

WP WP description BoM CD LI Notes
Primary Work Packages
TIAG Advisory Group 0.2 0.1 0.1
TIDA Data Assimilation 1.1 0.9 0.2 Obs Capability
TISD Suite Design 0.4 0.2 0.2 Portable suites, Suite docs
TIRS Rose-Cylc Development 1.0 0.5 0.5 Cylc-8 Development
TING Next-Gen Modelling System 0.9 0.9 0.0 0.5 subject to gaining funding
TIAN Ancillaries 0.3 0.2 0.1 ANTS: figs from last year
TICT UM Configuration Testing 0.3 0.2 0.1 UM model Partner Development Group
Primary WP Sub-total 4.2 3.0 1.2
Other TI Collab
TIPP Improver Post-processing & Verification 9.0 2.0 7.0 Currently only BoM-MO collaboration
TIVE Verification 0.5 0.3 0.2 GES/RES, METplus
TILI Land-surface data assimilation 0.0 0.0 LIS
Other TI Collab Sub-total 9.5 2.3 7.2
Total 13.7 5.3 8.4

Previous versions of this page

Links