access_NewSun_014 - ACCESS-NRI/accessdev-Trac-archive GitHub Wiki
#!html
<h1 style="text-align: center; color: green"> CAWCR-BoM ACCESS NWP Ngamai Migration Working Group</h1>
Meeting 14: Wednesday 13th November 2013, 10E Meeting Room
Present: Ed Habjan, Jim Fraser, Chris Tingwell, Asri Sulaiman, Joan Fernon, Ilia Bermous, Yi Xiao, Michael Naughton, Rob Jukic
Apologies: Joerg Henrichs, Wenming Lu, Robin Bowen, Martin Dix, Zhihong Li
- Items from previous meeting notes
- AOB
- AG-1 now archiving to MARS from ngamai.
- AR-1 pi files not being kept.
- May send pi files to raijin for SREP, or produce pi files required by SREP on the fly?
- AG-1 Went operational on ngamai yesterday.
- First operational system on ngamai.
- Running in new NMOC SMS scheduler.
- Relatively smooth changeover.
- AG-1 suite on solar changed to "test".
- More output products being switched on today.
- Run times still good after all postprocessing task turned on.
- Gary's diagnostic - work in progress, mjn following up; aim to run for all systems.
- Hourly archive to MARS for first 24 hours, then 3-hourly for multi-level fields.
- All surface fields are archived hourly.
- Data extraction task now done on ngamai - executing in real-time.
- SST generation also using real-time input.
- Downstream output products still to be done.
- Since it uses similar scripts to ACCESS-G, no problems expected.
- Plan to make AR-1 operational on ngamai in 1 week's time.
- Development AR1
- work in progress - ciwt now running, but not routinely yet.
- Now running in real-time
- Verification of surface fields to be done (Xiaoxi); ditto for Rainval.
- Some data from not AR-1 runs not ingested to MARS due to problems. Data kept on disk, to run ingestion manually when time permits.
- Due to disk problems releated to NFS issues making I/O performance very bad.
- Oracle investigating the problem.
- MARS client on solar not working - to catch up using Ngamai.
- ADN also being archived into MARS.
- Joan has made considerable progress in getting ATC-1 ready to run on ngamai.
- Requires final check of all scripts and components.
- Aim to get it running first and leave "Big-Domain" ancillary reconfiguration upgrade to later.
- May need more than 2 weeks -- ATC is not critical to solar switch-off.
- Successfully commissioned. Currently in use to control ngamai operational sms suites.
- Twister is still the operational-development server with similar s/w to nmoc-sms
- Contact Milton if CACWR wants the latest NMOC sms setup
-
Continue regular reminder to users re their migration.
-
Work getting UMUI jobs on ngamai to work is being done as required.
- UM versions being addressed include vn7.5, vn7.8, vn7.9, vn8.2 and vn8.4.
- potentially, each version may need a build job and a run job for both ngamai and raijin, totalling 20 different jobs (4x5).
- Not all have been done. Development work will be done based on user needs.
-
Research porting being supported, but need to temper user expectations to limitations of IT resources.
-
Change of group name "access" to "access.admin" on ngamai to make it the same as at NCI.
- No problem expected as gid (group-id) will remain the same.
- Need to coordinate when to do it.
-
Work to get Rose and Cylc available on ngamai being done by Robin and Wenming.
- Work in progress. Wenming following up with Martin.
- Identify staff to work on Raijin version.
- mjn to follow up
- Target date of shutdown is 30th November. James Mandilas managing.
- Some nodes have been shut down.
- 2 racks disabled
- rack 5/6 on reduce nodes
- rack 3 to be taken off tomorrow
- More information available from http://wiki.bom.gov.au/foswiki/Main/HPCCC.
- Further work on build documentation page ( https://trac.nci.org.au/trac/access/wiki/Access_NWP_Build_Procedures ) desired
- Add build documentation of small execs
- For now only Joan is available from NMOC to test out the builds - will not happen until after ngamai is fully operational.
-
Porting of AGREPS development ensemble suite to ngamai.
- work-in-progress (azs,mjn,David Smith).
- Global Forecast suite now running on ngamai and raijin.
- Global Pertubation suite having problem with ops steps. Xiao helping.
- Will add documentation of AGREPS executables to "Build Documentation" page (azs).
-
Porting of APS2 to ngamai.
- work-in-progress (Xiao).
- APS-2 already runs on raijin although it is behind real time.
-
Research APS-1 on ngamai.
-
Running of full suite is not required.
-
Only run component as needed. Capability for this is already available.
-
Joan away on leave in December.
-
Asri will be away 16th Dec - 13th Jan.
# * * * 11am Wed 27th November 2013, 10E Meeting Room * * *
#!html
<h2 style="text-align: left; color: red"> ---> NOTE: 10 East MEETING VENUE </h2>
[azs,Wed 20/11/2013] First draft.
[mjn,Mon 25/11/2013] Miinor changes.