access_AccessNWPSuiteDesignDiscussion15Oct2014 - ACCESS-NRI/accessdev-Trac-archive GitHub Wiki

Notes page for 15 Oct 2014 ACCESS NWP Suite Design roundtable discussion

IN PROGRESS -- NOT YET USABLE

PageOutline

Level 9E Conference Rooms

Bureau of Meteorology, 700 Collins St, Melbourne

2:00-3:30pm Tuesday 15 October 2014

Present

Michael Naughton, Jim Fraser, Hilary Oliver, Yi Xiao, Wenming Lu, Asri Sulaiman, Robin Bowen, Joan Fernon, Jin Lee, Fabrizio Baordo, Craig MacLachlan, Chris Tingwell, Peter Steinle, Vinod Kumar

9:00 Room open for pre-workshop setup
9:30 Michael Naughton [attachment:Naughton_Welcome_and_Introduction.pptx Welcome and Introduction]
9:35 Hilary Oliver Introduction to Rose and Cylc infrastructures for specification and running of complex suites
NIWA use of Rose & Cylc for operational UM NWP suites
10:45 Morning Tea
11:10 Jim Fraser [attachment:BNOC_operational_scheduling.pptx Bureau use of SMS for operational scheduling, and plans for evaluation of job scheduling options for future Bureau operational needs]
11:40 Yi Xiao [attachment:ACCESS_NWP_System_Design_XM.pptx ACCESS NWP suites design for research and operations]
12:00 Wenming Lu [attachment:Cylc_SMS_Interoperable_Suite.pptx ACCESS-C prototype Rose-Cylc and Rose-SMS interoperable suite design]
12:15 Asri Sulaiman [attachment:sulaiman_rose_cylc_infra_14Oct_V11.ppt ACCESS Rose-Cylc technical infrastructure at NCI and BoM ]
12:30 Lunch
1:45 Scott Wales Plans for ACCESS UMUI legacy usage support
2:00 Martin Dix Use of Rose-Cylc for ACCESS Coupled Model
2:20 Craig MacLachlan [attachment:MacLachlan_Rose_workshop.ppt Migration of Met Office coupled model to Rose]
2:40 Martin Dix Open discussion canvassing user input on ACCESS training events and online materials
2:50 Afternoon Tea
3:15 Hilary Oliver Advanced Cylc scheduler topics tutorial (*)
5:00 Finish

Links