6. VIRTUAL IMPLEMENTATION - A-Division-2023-24-Odd/Repo-04 GitHub Wiki
6.1 3D MODEL
LOADER
- Side wall
- Front wall
- Back wall
- final assemble
BASE
- base
- stand side
- stand base
- final assem
Indication unit
indication case
Final Indication case
crushing unit
1. Piston
- Piston clip
3. Linkage (1)
- Short linkage
- Bolt
- COMPLETE PISTON
Disposal unit
-
BIN
6.2 CIRCUIT DIAGRAM
Indication unit
Sensing unit
Actuator
Complete cicuit
6.3FLOW CHART
Flow chart of handling unit
Flow chart of storage unit
Flow chart of indication unit
Flow chart of disposal unit
6.4 BLL OF MATERIALS (BOM)
6.4.1 Electronic items
SL.NO | PART NAME/DRAWING | PERSON RESPONISBLE | NAME OF THE MATERIALS | SPECIFICATIONS | QUANTITY | FABRICATION PROCESS, IF NEEDED |
---|---|---|---|---|---|---|
SUBSYTEM 1 (Handling System ) | ||||||
1 | OPERATOR | APRAMEY D | ARDIUNO | MEGA 2560 | 1 | |
2 | CABLE | APRAMEY D | CABLE | 1.5m | 1 | |
3 | CONNECTIONS | MAITRI | Single strand wire | 1m (black,green) | each 1 | |
4 | CONNECTIONS | MAITRI | JUMPER WIRES(male to female) | 15cm | 20 | |
5 | POWER JACK | PRATIKSHA | DC power jack female adapter con | |||
SUBSYTEM 2 (Indication System) | ||||||
1 | LED LIGHTS | KATILA R NAG | LED LIGHTS | RED,YELLOW,GREEN | EACH ONE | |
2 | SENSING | PRATIKSHA | IR SENSOR | - | 1 | |
3 | ||||||
4 | ||||||
5 | ||||||
SUBSYSTEM 3(Crushing unit) | ||||||
1 | SLIDER CRANK | PRAJWAL S M | DC MOTOR | 12V,30RPM | 1 | |
2 | WIRES | PRAJWAL S M | SINGLE STRAND WIRE | 1m(BLACK,RED) | EACH 1 | |
3 | DRIVER | PRAJWAL S M | MOTOR DRIVER | 2Channel relay module 5V,1A | 1 | |
4 | ||||||
5 | ||||||
SUBSYSTEM 4 (DISPOSAL SYSTEM) | ||||||
1 | SENSING | PRATIKSHA | IR SENSOR | - | 1 | |
2 | ||||||
3 | ||||||
4 | ||||||
5 |
6.4.1 Mechanical items
6.5 MECHANISMS AND RESOURCE SPECIFICATIONS
IT is a SLIDER CRANK mechanism