Meeting Notes #5

bgmrsln edited this page Mar 20, 2023 · 5 revisions

Meeting 5

Details

🗓️ Date: 19/03/2023
🕖 Time: 18.00 - 19.00
📍 Location: Zoom
📝 Note Takers: Begüm Arslan

Attendees

  • Aras Güngöre
  • Begüm Arslan
  • Cahid Enes Keleş
  • Egecan Serbester
  • Halil İbrahim Gürbüz
  • Hasan Bingölbali
  • Mehmet Emin İpekdal
  • Mehmet Kuzulugil
  • Merve Gürbüz
  • Ömer Şahin Albayram
  • Ramazan Burak Sarıtaş

Agenda

  1. Review the previous req.
  2. system req, gorev dagilimi
  3. Milestones

Meeting Notes (Numbering is done according to the agenda)

  1. Reviewed the previous requirements.
  • System requirements are connected to user requirements.
  1. System requirements: deciding on roles:
  • profile is assigned to Mehmet.
  • feedback system is assigned to Merve.
    • Feedback system is for informing the admin about false information, and banning the users related to it.
    • It can also be used for approving a need or resource, this way these items can be above in a list.
  • Resource is assigned to Burak and Begüm for revision.
    • Resource type should be flexible. There are constant types and an other type.
    • There should be an upper class for boots and shoes as an example.
    • Resources should be updated based on discussion.
  • Event and Action is assigned to Cahid and Aras.
    • Event and action difference is asked to Alper hoca. It will be shared with the group.
  • Need is assigned to Merve and Şahin.
  • Map is assigned to Hasan.
  • If one wants to comment on an issue assigned to someone else, they can write it on the page inside paranthesis with their names.
  • Or they can write it to under issue.
  • Annotaion is assigned to Emin
  • Administration is assigned to Şahin, Hasan.
  • Notification should be revised and first two points should be deleted.
  1. Mock Ups
  • Each page should be carried into another mockup if storage error is encountered.
    • They should be saved into github.
  • Map Mockup is added by Hasan.
  • Event and Action mock ups should be prepared by Halil and Hasan is the reviewer.
  • Actions should be added into main page mock up.

Glossary should be written after some points are discussed.

  • Entity of information can be used to imply a resource, need, event and action.
  • Need is decided against demand by unanimity .   We can have a little meeting before the class. Use of Whatsapp should be reduced.

Action Items

Action Issue Assignee(s) Deadline
Action link Member DD/MM @ HH.MM
Issue: Annotation - Mehmet Emin İpekdal 21/03
Issue: Needs - Merve Gürbüz, Aras 21/03
Issue: Resources - Begüm and Burak 21/03
Issue: Event and Action - Aras and Cahid 21/03
Issue: Feedback System - Merve Gürbüz 21/03
Issue: New mockups - Halil İbrahim Gürbüz 21/03

Group 2 Disaster Response Platform

CMPE451

📌 Communication Plan
📌 Docker and local deployment tutorial
📌 RAM
📌 Test Traceability Matrix

📜 Rules
📝 Lab Reports
📅 Meetings
📅 Backend Team Meetings
📅 Mobile Team Meetings
👥 Team Members

CMPE352

📌 Milestone Report 1

📌 Milestone Report 2

📅 Meetings
👥 Team Members
📁 Project
🔍 Research
📜 Rules
📝 Templates
💬 Interviews
Clone this wiki locally